My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2011-182 AUTHORIZING EXECUTION OF TASK ORDER NO. 16
COD
>
City Clerk
>
RESOLUTIONS
>
2011
>
R2011-182 AUTHORIZING EXECUTION OF TASK ORDER NO. 16
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/31/2015 11:10:45 AM
Creation date
8/31/2015 11:10:44 AM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R2011-182
Res Ord Title
AUTHORIZING EXECUTION OF TASK ORDER NO. 16 FOR CONTINUING AGREEMENT FOR ENGINEERING SERVICES
Department
Water
Approved Date
11/21/2011
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
-2- <br /> The Task Order will authorize Black& Veatch to perform the following services: <br /> • Phase I Investigation — Perform 6 to 8 test borings, convert them to observation wells, <br /> perform step-drawdown testing, develop aquifer characteristics. Cost $70,050. <br /> • Phase II Investigation — Perform detailed aquifer test(s), install additional well(s), <br /> perform 10 day water yield test(s). Cost $154,800 for one test, $265,750 for two tests. <br /> • Groundwater Modeling (Optional) — If needed, use computer modeling software to <br /> determine aquifer yield and drawdown under a variety of conditions. Cost$31,600. <br /> The Phase I Investigation will be done first. If the results of Phase I are favorable, the City will <br /> authorize the Phase II Investigation. If Phase II results indicate that critical additional data is <br /> needed, the City will authorize the optional Groundwater Modeling. Therefore, the cost of these <br /> services will range from $224,850 to $367,400 depending on the results of Phase I, Phase II and <br /> the need for additional critical data. <br /> This project includes the installation of new observation and test production well(s). The State <br /> of Illinois requires that all such wells that are no longer needed be properly abandoned, removed <br /> and sealed to protect groundwater quality. Therefore, this Task Order also includes pre- <br /> negotiated per well prices to perform this work as needed. These costs would be in addition to <br /> those explained in the above paragraph, and would be presented to Council for approval prior to <br /> the work being done. <br /> POTENTIAL OBJECTION: <br /> None foreseen. <br /> STAFF REFERENCE: <br /> Keith Alexander, Director of Water Management, 217-424-2863 or kalexander@decaturil.gov <br /> BUDGET/TIME IMPLICATIONS: <br /> This expenditure is in the 2010 Project Fund budget. <br /> Attachments <br /> cc: John Schilling, Black& Veatch <br /> Gregg Foltz, H. L. Chastain& Associates <br /> Steve Johnson, IEPA <br />
The URL can be used to link to this page
Your browser does not support the video tag.