My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2011-182 AUTHORIZING EXECUTION OF TASK ORDER NO. 16
COD
>
City Clerk
>
RESOLUTIONS
>
2011
>
R2011-182 AUTHORIZING EXECUTION OF TASK ORDER NO. 16
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/31/2015 11:10:45 AM
Creation date
8/31/2015 11:10:44 AM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R2011-182
Res Ord Title
AUTHORIZING EXECUTION OF TASK ORDER NO. 16 FOR CONTINUING AGREEMENT FOR ENGINEERING SERVICES
Department
Water
Approved Date
11/21/2011
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DEPARTMENT OF WATER MANAGEMENT <br /> Memorandum No. 2011-20 <br /> November 14, 2011 <br /> TO: Mayor Michael T. McElroy and City Council <br /> FROM: Ryan P. McCrady, City Manager <br /> Keith D. Alexander, Director of Water Management <br /> SUBJECT: Shallow Groundwater Supply- Potential Well Site Exploration <br /> SUMMARY RECOMMENDATION: <br /> Council adopt the attached Resolution authorizing Task Order No. 16 for Potential Well Site <br /> Exploration for the Continuing Agreement for Engineering Services with Black & Veatch <br /> Corporation for a fee not to exceed $367,400. <br /> BACKGROUND: <br /> Our community needs 10,000 acre feet of supplemental water supply to ensure that we have <br /> enough water during a severe drought lasting approximately 8 months. This supplemental water <br /> may also be invaluable in case of other extreme emergency situations involving our water <br /> system. The Archer Daniels Midland Company has developed a plan to obtain 5,200 acre feet <br /> and the City continues to investigate the most cost effective options to obtain the remaining <br /> 4,800 acre feet of water. As authorized by Council, Black & Veatch completed an evaluation of <br /> shallow groundwater resources near the South Water Treatment Plant, and presented their <br /> findings to Council on November 7,2011. The evaluation preliminarily concluded that: <br /> There appears to be a 40 feet thick water bearing sand and gravel aquifer adjacent to the <br /> Lake Decatur shoreline in the vicinity of the South Water Treatment Plant. The aquifer is <br /> between 40 and 80 feet below ground surface. <br /> • A shallow groundwater collector well constructed in this vicinity could potentially yield <br /> 2,350 to 4,030 acre feet of water, and two collector wells could potentially yield <br /> approximately twice that amount. <br /> • The preliminary cost estimate for one collector well is $2.4M and $4.8M for two wells. <br /> Since the preliminary findings are that a two collector well system can provide at least 4,700 acre <br /> feet of water at a reasonable cost, it is recommended that Council approve Task Order No. 16 to <br /> determine with a very high degree of certainty: 1) exactly where a collector well system or <br /> systems should be located, 2) what the water yield will be, and 3) what the collector well site <br /> specific design criteria should be. <br />
The URL can be used to link to this page
Your browser does not support the video tag.