My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2011-182 AUTHORIZING EXECUTION OF TASK ORDER NO. 16
COD
>
City Clerk
>
RESOLUTIONS
>
2011
>
R2011-182 AUTHORIZING EXECUTION OF TASK ORDER NO. 16
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/31/2015 11:10:45 AM
Creation date
8/31/2015 11:10:44 AM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R2011-182
Res Ord Title
AUTHORIZING EXECUTION OF TASK ORDER NO. 16 FOR CONTINUING AGREEMENT FOR ENGINEERING SERVICES
Department
Water
Approved Date
11/21/2011
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
memorandum describing the data, findings and recommendations from the Phase II <br /> investigation and submit to Owner for review. <br /> 5. Meet with Owner in Decatur to receive Owner's review comments. <br /> 6. Prepare and submit final report including data, findings, and recommendations from <br /> Phases I and II and incorporating Owner's review comments. <br /> SUPPLEMENTAL SERVICES <br /> Any work requested by Owner that is not included in Basic Services as described above <br /> for Phases I or II will be considered Supplemental Services and will be eligible for <br /> additional compensation as described in Attachment B or negotiated separately. <br /> Supplemental services shall include, but are not limited to: <br /> I. Geophysical exploration. <br /> 2. Groundwater modeling. <br /> 3. Construction of temporary access roads, the use of all terrain drilling equipment, tree <br /> clearing or other measures to allow access to drilling sites that result in additional <br /> costs for Engineer. <br /> 4. Drilling procedures that may become necessary to extend the test borings in Phase I <br /> or the test production wells in Phase II to a depth greater than 80 feet. <br /> 5. Abandonment and removal of wells. <br /> 6. Additional meetings with local, State, or Federal agencies beyond those described in <br /> basic services. <br /> 7. Additional appearances at public hearings or before special boards beyond those <br /> described in Basic Services. <br /> 8. Supplemental engineering work to meet the requirements of regulatory or funding <br /> agencies that become effective subsequent to the date of this Agreement. <br /> 9. Additions or modifications to update final reports after publication. <br /> 10. Land surveying services, testing laboratory services, geotechnical services, or <br /> environmental assessments except as described in Basic Services. <br /> 11. Bench scale testing or pilot plant testing. <br /> END OF ATTACHMENT A <br /> 6 <br /> City of Decatur Task Order No. 16 <br /> Rev. 11-4-11 <br />
The URL can be used to link to this page
Your browser does not support the video tag.