Laserfiche WebLink
al SPECIAL OPERATIONS GROUP,LLC <br /> 308 Industrial Drive Griffith.IN 46319 <br /> InfrastrLiotureil <br /> (Pt I)219-924-6577 (FAX)219-924-7505 <br /> PROJECT CHANGE ORDER <br /> Whereas the parties to the below listed project have identified the following changes to the original <br /> Now,therefore,for valuable consideration,the parties agree as follows. <br /> Date 11/15/2011 <br /> GI SOG PROJECT NUMBER: GISOG-10-1000 Change Order : 22 <br /> CLIENT CONTRACT/PO NUMBER: City Project 09-02 <br /> PROJECT NAME: Lake Decatur Dan Repairs <br /> CLIENT NAME: City of Decatur Department of Public Works Decatur Illinois <br /> REQUESTORS NAME: James Rolette <br /> CLIENT ADDRESS: Decatur,City Purchasing Department <br /> #1 Gary K.Anderson Plaza <br /> Decatur Illinois 62523 <br /> The scope of work for the above named project is modified from the Origh al Scope of Work <br /> Global Infrastructure will remove and install with new the weer bands located in the North and South Sluice gate <br /> guide slots.Additional repairs are required above the 14 ft level which is above the bid documents outline. Larger <br /> material was found within the sluice gate guide slots.This change order covers the cost for additional material and <br /> hardware cost. <br /> Testing of the sluice gates will be delayed until the spring of 2012 due to the low face levels and additional work. <br /> Previous estimated cost of Project $3,392,023.34 <br /> Anticipated cost of Change Order#22: <br /> Additional cost associated with this change order will be $50,000.00. <br /> paid at a Forced Account basis. <br /> Revised estimated cost of Project: $3,442,023.34 <br /> Additional time required to complete change order. May 1st,2012 <br /> IN WITNESS WHEREOF, the parties have caused this Project Change Order to be executed by their <br /> duly authorized Representatives as of theday;andr referenced below. <br /> Client: City o Dec ur GI Special ns Group LC <br /> Signature: Signature: <br /> Printed Nam: Michael T. McElroy Printed Name: James Rolette <br /> Title: Mayor Tide: Project Manager <br /> Date: November 21, 2011 Date: 11/15/2011 <br /> ATTEST: (1hQ <br /> C <br /> Celeste F. Harris, eity Clerk <br />