My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2011-177 AUTHORIZING AN AGREEMENT WITH NORFOLK SOUTHERN RAILWAY COMPANY
COD
>
City Clerk
>
RESOLUTIONS
>
2011
>
R2011-177 AUTHORIZING AN AGREEMENT WITH NORFOLK SOUTHERN RAILWAY COMPANY
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/31/2015 1:26:29 PM
Creation date
8/31/2015 1:26:28 PM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R2011-177
Res Ord Title
AUTHORIZING AN AGREEMENT WITH NORFOLK SOUTHERN RAILWAY COMPANY FOR PRELIMINARY ENGINEERING SERVICES FOR THE BRUSH COLLEGE ROAD PROJECT
Department
Public Works
Approved Date
11/21/2011
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ITEM F-Signal& Electrical Chances <br /> Material: (see attached surmnary) 0 <br /> Labor: (see attached summary) 0 <br /> Equipment: (see attached summary) 0 <br /> NET TOTAL-ITEM F $ - <br /> ITEM G-'Track Work <br /> Material: (see attached summary) 0 <br /> Labor: (see attached summary) 0 <br /> Equipment: (see attached summary) 0 <br /> NET TOTAL-ITEM G $ - <br /> ITEM H-T-CUBED <br /> Lump Sum $ - <br /> NOTES <br /> 1. For all groups of CONTRACT employees,the composite labor <br /> surcharge rate used in this estimate(excluding insurance) <br /> is 185.26%. Self Insurance-Public Liability Property <br /> Damage is estimated at 16.00%. Work will be billed at <br /> actual current audited rate in effect at the time the <br /> services are performed. <br /> 2.For all groups of NON-CONTRACT employees,the composite <br /> labor surcharge rate used in this estimate(excluding <br /> insurance is 70.24%. Self Insurance-Public Liability <br /> Property Damage is estimated at 16.00%. Work will be <br /> billed at actual current audited rate in effect at the <br /> time the services are performed. <br /> 3. All applicable salvage items due the Department will be <br /> made available to it at the jobsite for its disposal. <br /> 4.The Force Account Estimate is valid for one(1)year <br /> after the date of the estimate(11/15.2011). If the work is <br /> not performed within this time frame the Railway may <br /> revise the estimate to(1)include work not previously <br /> indicated as necessary and(2)reflect changes in cost <br /> to perform the force account work. <br />
The URL can be used to link to this page
Your browser does not support the video tag.