My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2011-175 APPROVING CHANGE ORDER 1
COD
>
City Clerk
>
RESOLUTIONS
>
2011
>
R2011-175 APPROVING CHANGE ORDER 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/31/2015 1:30:54 PM
Creation date
8/31/2015 1:30:52 PM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R2011-175
Res Ord Title
APPROVING CHANGE ORDER 1 TO THE AGREEMENT WITH URS CORPORATION FOR PRELIMINARY DESIGN OF THE BRUSH COLLEGE ROAD NORFOLK SOUTHERN RAILROAD CROSSING
Department
Public Works
Approved Date
11/7/2011
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Exhibit A <br /> F. Prepare for and attend planning and review meetings. <br /> G. Address plan review comments and prepare final Geometric Plan. <br /> Task 00500—Traffic Maintenance Analysis <br /> The following will be performed as part of the traffic maintenance analysis: <br /> 1. Consider construction of an overpass at Faries Parkway: <br /> A. Perform analysis of traffic impacts. Determine if it will be feasible to maintain traffic on <br /> Brush College Road and Faries Parkway during construction of an overpass. <br /> B. Consider stage construction. <br /> C. Develop traffic maintenance alternatives. If required, consider detour options, traffic impacts <br /> and adverse travel of detour route. <br /> D. Evaluate accommodation of pedestrians and bicyclists during construction. <br /> E. Evaluate need for wide-load detour. <br /> 2. Consider construction of an intersection with all legs raised: <br /> A. Perform analysis of traffic impacts. Determine if it will be feasible to maintain traffic on <br /> Brush College Road and Faries Parkway during construction of an elevated intersection. <br /> B. Consider stage construction. <br /> C. Develop traffic maintenance alternatives. If required, consider detour options, traffic impacts <br /> and adverse travel of detour route. <br /> D. Evaluate accommodation of pedestrians and bicyclists during construction. <br /> E. Evaluate need for wide-load detour. <br /> 3. Coordinate with local officials and businesses. <br /> 4. Prepare MOT summary for selected alternate. Summary to include the following: <br /> A. Summary statement <br /> B. Traffic characteristics including expected ADT during construction, functional classification <br /> of road and percentage breakdown for each vehicular type <br /> C. Provide design information of lane reductions and roadway detours <br /> D. List alternatives and recommendation <br /> E. Prepare for planning and review meetings <br /> F. Address summary review comments and prepare final summary <br /> Task 00600—Structure Studies <br /> 1. The following will be performed for a structures study for the alternative of a highway bridge <br /> carrying Brush College Road over Faries Parkway and the NS track: <br /> A. Determine number, configuration, and length of spans <br /> B. Evaluate superstructure alternatives—PPC girder, steel beam, steel plate girder <br /> 7-26-11 A-7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.