Laserfiche WebLink
Exhibit A <br /> with associated costs. Exhibits and related supporting information will be prepared for utility <br /> coordination. <br /> G. Estimated construction costs related to the roadway will be developed for an overpass at <br /> Faries Parkway. <br /> H. Prepare Executive Summary with exhibits including typical sections, plan/profile drawings, <br /> and aerial plan. <br /> I. Prepare for and attend planning and review meetings <br /> J. Address Executive Summary review comments and prepare final Executive Summary. <br /> 2. The following conceptual studies will be performed for the option of constructing an elevated <br /> intersection at Brush College Road and Faries Parkway: <br /> A. Develop layout of elevated intersection at Brush College Road and Faries Parkway. <br /> B. Establish horizontal alignment of Brush College Road and Faries Parkway. <br /> C. Prepare conceptual vertical alignment studies of Brush College Road and Faries Parkway. It <br /> is assumed that the railroad tracks near the intersection will remain at their existing <br /> elevation. <br /> D. Evaluate impacts to side streets and entrances and develop street closure/access plan. <br /> E. Property impacts and right-of-way needs will be reviewed for this option. <br /> F. Review overhead and underground utility impacts for this option. Coordination will be <br /> performed to determine extent of impacts and potential options available for relocation along <br /> with associated costs. Exhibits and related supporting information will be prepared for utility <br /> coordination. <br /> G. Evaluate the feasibility of relocating the spur tracks servicing the ADM West Plant. <br /> H. Estimated construction costs related to the roadway will be developed for an elevated <br /> intersection at Brush College Road and Faries Parkway. <br /> 1. Prepare Executive Summary with exhibits including typical sections, plan/profile drawings, <br /> and aerial plan. <br /> J. Prepare for and attend planning and review meetings. <br /> K. Address Executive Summary review comments and prepare final Executive Summary. <br /> 3. The feasibility of relocating the Norfolk Southern track crossing the north leg of the Brush College <br /> Road/Faries Parkway intersection will be studied. <br /> 4. The recommended alternative will be further developed and refined. The following will be <br /> performed as part of this task: <br /> A. Refine and establish the proposed roadway vertical alignment <br /> B. Establish clear zones, barrier/attenuator warrants and uses to determine clear width of <br /> roadway. <br /> C. Perform cross section analysis to determine extent of right-of-way and easement needs. <br /> Analysis to also establish extent of retaining walls to minimize right-of-way impacts. <br /> D. Review warrants and need for lighting of roadway. <br /> E. Prepare& submit Preliminary Geometric Plan. <br /> 7-26-11 A-6 <br />