My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2011-175 APPROVING CHANGE ORDER 1
COD
>
City Clerk
>
RESOLUTIONS
>
2011
>
R2011-175 APPROVING CHANGE ORDER 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/31/2015 1:30:54 PM
Creation date
8/31/2015 1:30:52 PM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R2011-175
Res Ord Title
APPROVING CHANGE ORDER 1 TO THE AGREEMENT WITH URS CORPORATION FOR PRELIMINARY DESIGN OF THE BRUSH COLLEGE ROAD NORFOLK SOUTHERN RAILROAD CROSSING
Department
Public Works
Approved Date
11/7/2011
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Exhibit A <br /> Task 00300—Location Drainage Study <br /> A limited location drainage study will address drainage-related elements required for constructing a grade <br /> separation at Faries Parkway. The scope of the drainage study will include identifying the existing drainage <br /> system and developing a conceptual drainage scheme for an overpass at Faries Parkway. No hydraulic <br /> analysis, storm sewer outlet evaluation, or stormwater detention will be performed. <br /> 1. Plans will be developed for the existing drainage system in accordance with the IDOT Drainage <br /> Manual. URS will determine the existing drainage system, identify drainage patterns and drainage <br /> features, structures, and document any existing drainage problems. This work will include: <br /> A. Preparing an Existing Drainage Plan. Information from survey work and available plans <br /> from previously constructed improvements within the project's limits will be incorporated <br /> into the existing drainage plan. <br /> B. Evaluating and documenting any existing drainage problems. <br /> C. Identifying Base Floodplains <br /> D. Identifying Major Drainage Features <br /> 2. Conceptual drainage provisions for an overpass at Faries Parkway will be formulated. Proposed <br /> solutions to any identified existing drainage problems will be developed. The following drainage- <br /> related tasks will be performed for a roadway overpass at Faries Parkway: <br /> 1. Develop Drainage Design Criteria <br /> 2. Evaluate impacts on right-of-way for proposed drainage system elements. <br /> 3. Develop conceptual drainage alternatives details for overpass at Faries Parkway. Drainage <br /> elements may consist of a fully enclosed system or a combination of ditches and storm <br /> sewers. The proposed drainage plan will show key design elements and the layout of the <br /> drainage system. <br /> 4. Prepare Drainage Study Exhibits. <br /> 3. A railroad drainage study will be made to assess existing drainage conditions and assess any <br /> modifications to it that may be needed to accommodate any changes to the roadway alignment or <br /> reconfiguration of the railroad tracks that may be required as part of the project. <br /> Task 00400—Alternate Geometric Studies <br /> 1. The following conceptual studies will be performed for the option to construct an overpass carrying <br /> Brush College Road over Faries Parkway: <br /> A. Develop layout of overpass including ramps to Faries Parkway. <br /> B. Establish horizontal alignment of Brush College Road and ramps. <br /> C. Prepare conceptual vertical alignment studies of Brush College Road and ramps. It is <br /> assumed that the railroad tracks at the Faries Parkway intersection will remain at their <br /> existing elevation. <br /> D. Evaluate impacts to side streets and entrances and develop street closure/access plan. <br /> E. Property impacts and right-of-way needs will be reviewed for this option. <br /> F. Review overhead and underground utility impacts for this option. Coordination will be <br /> performed to determine extent of impacts and potential options available for relocation along <br /> 7-26-11 A-5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.