My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2011-155 APPROVING CHANGE ORDER TO AGREEMENT WITH HOMER L. CHASTAIN & ASSOCIATES, LLP.
COD
>
City Clerk
>
RESOLUTIONS
>
2011
>
R2011-155 APPROVING CHANGE ORDER TO AGREEMENT WITH HOMER L. CHASTAIN & ASSOCIATES, LLP.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/31/2015 2:39:43 PM
Creation date
8/31/2015 2:39:42 PM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R2011-155
Res Ord Title
APPROVING CHANGE ORDER TO AGREEMENT WITH HOMER L. CHASTAIN & ASSOCIATES, LLP., FOR ENGINEERING DESIGN SERVICES FOR THE STREET IMPROVEMENTS TO SOUTH MAIN STREET AND SOUTH FRANKLIN STREET
Department
Public Works
Approved Date
10/3/2011
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
HOMER L. <br /> CHASTAIN <br /> & ASSOCIATES, LLP 5 N.COUNTRY CLUB ROAD 217-422-8544 <br /> CONSULTING ENGINEERS DECATUR,ILLINOIS 62521 FAX:217-422-0398 <br /> September 12, 2011 <br /> Mr. Matt Newell <br /> City Engineer <br /> City of Decatur <br /> One Gary K. Anderson Plaza <br /> Decatur, Illinois 62523-1196 <br /> Re: Change Order 1 <br /> Street Improvements: South Main and South Franklin Streets <br /> City Project Number: 2010-13 <br /> Dear Mr. Newell: <br /> During the course of the project we have encountered issues that are outside the original <br /> scope of the project. The following items describe the efforts involved to perform those <br /> tasks. <br /> Treatment of existing sidewalk ramps <br /> The Illinois Department of Transportation (IDOT) is now requiring all MFT projects to <br /> improve sidewalk ramps to meet current ADA policy. This extra work involved additional <br /> topographic data, design, drafting and calculation of quantities. <br /> 42.5 hours and $3,329 <br /> Special Waste Screening <br /> IDOT requires that any project which has linear excavation to perform a Special Waste <br /> Screening. This work consists of searching records on the IEPA website for locations of <br /> potential environmental impacts including underground storage tanks and leaking <br /> underground storage tanks. <br /> 3 hours and $322 <br /> Temporary Concrete Barrier(TCB)Wall Analysis <br /> IDOT is requiring TCB be used for the staged construction of the remove and replace <br /> section of Main Street or close the road and provide a Detour Route. This work involved; <br /> calculating cost options for the TCB, coordination with the City and IDOT, and working up <br /> details for staged construction to use TCB. <br /> 10 hours and $1,126 <br /> Pavement Options— Main Street <br /> This work consists of the preparation of cost estimates for different pavement <br /> configurations (reducing pavement removal and replacement areas, additional milling and <br /> overlay areas, different paving options including crack and seal repair). <br /> 20 hours and $2,252 <br />
The URL can be used to link to this page
Your browser does not support the video tag.