Laserfiche WebLink
Street Improvements: South Main and South Franklin Streets Page 1 of 2 <br /> City Project Number: 2010-13 <br /> Change Order 1 <br /> \\decfi1e\share1\Municipalities\City_of Decatur\5687_BR51_Maintenance_Rehab\Management\Change_Orders\[Change_Order1.xls]Option 3 Preferred <br /> Items Hours Dollars <br /> Treatment of existing sidewalk ramps <br /> Survey 14.5 $594.32 <br /> Design 15 $1,619.34 <br /> CADD 9 $785.80 <br /> Quantities 4 $329.56 <br /> Subtotal 42.5 $3,329.02 <br /> Special Waste Screening <br /> Design 3 $322.00 <br /> Temporary Concrete Barrier Wall (TCB)Analysis <br /> Design 10 $1,126.02 <br /> Pavement Options- Main Street <br /> Design 20 $2,252.04 <br /> Subtotal 75.5 $7,029.08 <br /> Plan Revisions-Main Street(Cleveland Avenue to Decatur Street) <br /> Full-Depth mill (6")and Overlay with 6" HMA-STA 676+00 to STA 684+00 <br /> 2" Mill and Overlay-STA 684+00 to STA 685+38, STA 685+38 = STA 128+98.2 to STA 141+73.88 <br /> Stage Construction on Main Street utilizing channelizing devices <br /> (Option of Detour Route should IDOT require TCB) <br /> Existing pavement condition investigation <br /> work with City forces to determine existing pavement conditions-and update pavement design <br /> Design 15 $1,689.03 <br /> Typical Sections <br /> Design 3 $337.81 <br /> CADD 6 $737.39 <br /> Adjust Quantities <br /> Design 15 $1,689.03 <br /> Schedules <br /> CADD 6 $737.39 <br /> Maintenance of Traffic <br /> Design 4 $450.41 <br /> CADD 8 $983.18 <br /> Detour Route <br /> Design 40 $4,504.08 <br /> CADD 20 $2,457.96 <br /> Removal Plans <br /> Design 6 $675.61 <br /> CADD 8 $983.18 <br />