My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2011-142 ACCEPTING THE BID AND AUTHORIZING A CONTRACT
COD
>
City Clerk
>
RESOLUTIONS
>
2011
>
R2011-142 ACCEPTING THE BID AND AUTHORIZING A CONTRACT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/31/2015 3:42:27 PM
Creation date
8/31/2015 3:42:26 PM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R2011-142
Res Ord Title
ACCEPTING THE BID AND AUTHORIZING THE EXECUTION OF A CONTRACT FOR ANNUAL WATER MAIN REPLACEMENT PROJECT
Department
Public Works
Approved Date
9/6/2011
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Drive has the highest repair rate for the neighborhood and is the highest priority. The old <br /> 6" main will be replaced with a 12" main for better flow and more reliable service. The <br /> larger main will be extended in future water main replacement projects to replace the old <br /> looped system which currently consists of smaller 6"water mains. Placing a larger main <br /> as the backbone of the looped system will provide the area with higher water pressure, <br /> higher capacity and better reliability. <br /> Bidding <br /> The project plans and specifications were prepared by Engineering Division staff. The project <br /> was advertised on Wednesday, August 10, 2011, and bids were opened on Friday, August 26, <br /> 2011. The results for the letting are as follows: <br /> ....... ................ ............................................................................................................................................................................................................................................................................._.......................................... . ............................................................................. <br /> Compared to <br /> Engineer's Est. <br /> Bidder Bid Price Over(-Under) <br /> ....................................................................... ................._............................................................................................... ......_.............._......._........_.;............................ ................................... ......... <br /> Barr & Robison Sewer& Excavating, Inc. $320,403..00_ (-10.07%..) <br /> ;..._Otto Baum Company, Inc. $381,.697.75.._......._...;_.....................7_._1.4 . <br /> G R R Construction, Inc. $388,667.80 9.09% <br /> .............................................................._.............................................................................................................................................................. ..... ........................._..................................._........__..._..........._...._....................... . .......... <br /> Burdick Plumbing & Heating Co„ Inc. $393,363.00 10.41% <br /> ................................................................................................................................................................................ .....................................................................................................<............................................................................................................................................................................................... <br /> Engineer's Estimate $356,175.00 <br /> ................ ......... .. ................................................................................................................_..............................._......................................._...... ........................-................. --...- <br /> .......................... <br /> Recommended Award <br /> Barr & Robison Sewer&Excavating, Inc. provided the low bid for the proposed work. Barr& <br /> Robison has satisfactorily completed numerous projects of similar nature in the City. Staff <br /> recommends that the City Council approve a contract with Barr&Robison Sewer &Excavating, <br /> Inc., to perform the Annual Water Main Replacement Project. <br /> POTENTIAL OBJECTION: There are no known objections to this resolution and bid award. <br /> INPUT FROM OTHER SOURCES: None <br /> STAFF REFERENCE: Richard Marley, Public Works Director, Keith Alexander, Director of <br /> Water Management and Matt Newell, City Engineer. Richard Marley and Keith Alexander will <br /> be in attendance at the City Council meeting to answer any questions of the Council on this item. <br /> BUDGET/TIME IMPLICATIONS: <br /> Budget Impact: <br /> Funding for this project is allocated in the Water Capital Projects Fund. The recommended low <br /> bid amount is $320,403. <br /> Page 12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.