R2011-131 APPROVING CONTRACT AMENDMENT
COD
>
City Clerk
>
RESOLUTIONS
>
2011
>
R2011-131 APPROVING CONTRACT AMENDMENT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/31/2015 4:05:07 PM
Creation date
8/31/2015 4:05:06 PM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R2011-131
Res Ord Title
APPROVING CONTRACT AMENDMENT CHANGE ORDER NO. 15 GLOBAL INFRASTRUCTURE LAKE DECATUR DAM REPAIRS
Department
Public Works
Approved Date
8/15/2011
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Change Orders <br /> Since the repairs currently being made are exposing areas of the dam not visible during annual <br /> inspections or the design process, additional deterioration and damage has been discovered to the <br /> bascule-gate seals, seal plates, torque tube, and armature plates. Global Infrastructure submitted <br /> change orders in August 2010 to repair similar damage to the north bascule gate. The Council was <br /> advised that work on the south bascule gate may uncover similar unforeseen deterioration and <br /> damage, which may require additional change orders. The City's engineering consultant, Hanson <br /> Professional Services, Inc, has reviewed and approved the following change orders and has <br /> recommended that the costs involved are reasonable for the complexity of the work to be <br /> performed. The scope of work and cost for each portion of this change order is outlined below. <br /> Change Order 15A: Repair the bent side seal plate on the south end of the south bascule gate. This <br /> damage was found after dewatering the gate. The steel plate will be heated and straightened back <br /> into its original shape. The repaired area will be painted to prevent corrosion. <br /> Cost: $4,599.71 <br /> Change Order 1513: Replace the side seals on each end of the bascule gate. <br /> Cost: $8,821.91 <br /> Change Order 15C: Replace the half moon shaped side seals which are located on both ends of the <br /> torque tube, making a seal between the tube and the side walls. The seal plates will be cleaned and <br /> recoated with the pre-approved paint. <br /> Cost: $17,833.40 <br /> Change Order 151): Replace the horizontal seal and cover with new fabricated stainless steel plates. <br /> The butt joints in the plates will be welded together. The stainless steel bolts holding the seal in <br /> position shall be replaced such that they will not damage the torque tube in the future. <br /> Cost: $60,824.93 <br /> Change Order 15E: Clean, complete surface repairs, and re-paint the north bascule gate torque <br /> tube. This work will be done using dry ice blasting. The existing bolts holding the horizontal seals <br /> in place came in contact with the torque tube, damaging the paint coating, and causing some <br /> gouging of the steel torque tube. <br /> Cost: $121,982.52 <br /> Change Order 15F: The side plates at each end of the south bascule gate will be dry ice blasted to <br /> remove the paint and corrosion, the damaged sections will be repaired, primed and repainted. <br /> Cost: $39,200.93 <br /> Change Order 15G: Repair the existing horizontal seal cover plates by removing them and <br /> manipulating them back to their original position. All failed welds will be repaired and painted to <br /> prevent corrosion. <br /> Cost: $10,622.18 <br /> Page 12 <br />