My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2011-106 AUTHORIZING AN AGREEMENT WITH URS CORPORATION
COD
>
City Clerk
>
RESOLUTIONS
>
2011
>
R2011-106 AUTHORIZING AN AGREEMENT WITH URS CORPORATION
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/1/2015 10:24:26 AM
Creation date
9/1/2015 10:24:22 AM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R2011-106
Res Ord Title
AUTHORIZING AN AGREEMENT WITH URS CORPORATION FOR ENGINEERING SERVICES TO DESIGN THE FINAL PHASE FOR REPLACEMENT OF THE SOUTH SHORES BRIDGE OVER SAND CREEK ARM OF LAKE DECATUR
Department
Public Works
Approved Date
7/5/2011
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
42
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Exhibit A <br /> Detailed Scope of Services <br /> South Shores Drive over Sand Creek Arm of Lake Decatur <br /> Final Design Phase <br /> Task 00100—Project Management <br /> The following tasks will be performed as part of the project management: <br /> 1. Prepare Electronic Work Authorization Form (eWAF)based on approved manhours and <br /> tasks. <br /> 2. Prepare spreadsheets for tracking project. <br /> 3. Prepare Project Execution Plan (PXP). <br /> 4. Prepare for and conduct project kickoff meeting. <br /> 5. Monthly progress report and updates to graph showing actual expenditures relative to <br /> budgeted will be prepared and submitted with the invoices. <br /> 6. A record of all project communication, coordination, transmittals and submittals will be <br /> documented, and maintained. <br /> 7. Schedule staff assignments, monitor budgets and manage development of deliverables <br /> and timeline. <br /> 8. Conduct internal staff and team meetings. <br /> Task 00200—Update Hydraulic Report <br /> The hydraulic report and waterway information table will be updated for the raised bridge. The <br /> original hydraulic report and waterway information table were generated prior to the decision to <br /> raise the bridge for an additional 3' of vertical clearance. <br /> Task 00300— Structure Design <br /> The following tasks will be included in the structural design: <br /> 1. Design/check required beam size for spans established in Phase I. <br /> 2. Design/check concrete slab for beam layout established in Phase I. <br /> 3. Design/check shear stud layout for composite design in both positive and negative <br /> moment regions. <br /> 4. Design/check beam splices <br /> 5. Design/check fixed bearing at pier <br /> 6. Develop/check top of slab elevations <br /> 7. Design/check bridge deck drainage system <br /> 8. Design/check bridge abutments and foundations <br /> 9. Design/check pier and foundation. <br /> 10. Design/check cofferdam seal coat and sheet piling at pier. <br /> 11. Design/check sheet pile wall to be included along north side of roadway. Design will <br /> include sheet pile cap and fencing—This work to be included in Task 20000 <br /> 6-8-11 A-1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.