My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2011-106 AUTHORIZING AN AGREEMENT WITH URS CORPORATION
COD
>
City Clerk
>
RESOLUTIONS
>
2011
>
R2011-106 AUTHORIZING AN AGREEMENT WITH URS CORPORATION
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/1/2015 10:24:26 AM
Creation date
9/1/2015 10:24:22 AM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R2011-106
Res Ord Title
AUTHORIZING AN AGREEMENT WITH URS CORPORATION FOR ENGINEERING SERVICES TO DESIGN THE FINAL PHASE FOR REPLACEMENT OF THE SOUTH SHORES BRIDGE OVER SAND CREEK ARM OF LAKE DECATUR
Department
Public Works
Approved Date
7/5/2011
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
42
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Exhibit A <br /> 12. Design of Pipe Bridge Superstructure - This work to be included in Task 20000 <br /> 13. Design of Pipe Bridge Substructure - This work to be included in Task 20000 <br /> Task 00400-Roadway Design <br /> The following work will be included in this task: <br /> 1. The pavement section will be determined based on the soil properties and the traffic <br /> volume <br /> 2. A detour plan will be developed if necessary <br /> Task 00500-Prepare Plans <br /> It is anticipated that the following plan sheets will be developed: <br /> 1. Cover Sheet <br /> 2. Summary of quantities and general notes. Quantities may need to be broken down into <br /> those covered by STU funds and those paid for by other funds. <br /> 3. Typical sections <br /> 4. Schedule of quantities <br /> 5. Horizontal layout <br /> 6. Plan and Profile Sheet <br /> 7. Storm Water Pollution Prevention Plan <br /> 8. Sanitary Sewer Details-This work to be included in Task 20000 <br /> 9. Residential Pump Station Details-This work to be included in Task 20000 <br /> 10. Roadway lighting plan <br /> 11. Roadway lighting details <br /> 12. Landscape details at Caceres' property-This work to be included in Task 20000 <br /> 13. Roadway Bridge General Plan&Elevation Sheet <br /> 14. General notes, bill of material, sheet index-roadway bridge <br /> 15. Substructure layout <br /> 16. Top of slab elevations-plan <br /> 17. Top of slab elevations-tables (IDOT Base Sheet E-S) <br /> 18. Top of West Approach Slab Elevations(IDOT Base Sheet E-AS) <br /> 19. Top of East Approach Slab Elevations(IDOT Base Sheet E-AS) <br /> 20. Superstructure Details-deck plan and deck section (IDOT Base Sheet SI-2-0) <br /> 21. Superstructure Details-parapets, deck drains, etc. (IDOT Base Sheet S-I-D) <br /> 22. Diaphragm details(abutments) (IDOT Base Sheet SI-DS2) <br /> 23. Approach Slab Details (IDOT Base Sheet BA-O, Sheet 1) <br /> 24. Approach Slab Details(IDOT Base Sheet BA-O, Sheet 2) <br /> 25. Steel Framing Plan <br /> 26. Structural Steel Details- shear stud layout, splice details, moment/shear tables <br /> 27. West Abutment <br /> 6-8-11 A-2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.