My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2011-106 AUTHORIZING AN AGREEMENT WITH URS CORPORATION
COD
>
City Clerk
>
RESOLUTIONS
>
2011
>
R2011-106 AUTHORIZING AN AGREEMENT WITH URS CORPORATION
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/1/2015 10:24:26 AM
Creation date
9/1/2015 10:24:22 AM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R2011-106
Res Ord Title
AUTHORIZING AN AGREEMENT WITH URS CORPORATION FOR ENGINEERING SERVICES TO DESIGN THE FINAL PHASE FOR REPLACEMENT OF THE SOUTH SHORES BRIDGE OVER SAND CREEK ARM OF LAKE DECATUR
Department
Public Works
Approved Date
7/5/2011
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
42
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Exhibit A <br /> 28. East Abutment <br /> 29. Pier-with Cofferdam Details <br /> 30. Pile Details <br /> 31. Bar Splicer Assembly Details (IDOT Base Sheet BSD-1) <br /> 32. Cantilever Forming Brackets (SB-1) <br /> 33. Concrete Parapet Slipforming Option (IDOT Base Sheet SFP-34) <br /> 34. Boring Logs <br /> 35. Sheet Pile Retaining Wall Details —wall, cap, fencing—This work to be included in <br /> Task 20000 <br /> 36. Sewer Pipe Bridge Superstructure Details - This work to be included in Task 20000 <br /> 37. Sewer Pipe Bridge Substructure Details—This work to be included in Task 20000 <br /> 38. Cross Sections <br /> Task 00600—Quantities,Estimates, Special Provisions,Bidding Phase Support <br /> The following work will be included in this task: <br /> 1. Calculate/check roadway, bridge, sewer and miscellaneous quantities. Breakdown for <br /> funding type if necessary. <br /> 2. Develop/check cost estimate for roadway and bridge. <br /> 3. Develop/check estimate of time. <br /> 4. Prepare special provisions for roadway and bridge. The IDOT Standard Specifications <br /> for Road and Bridge Construction shall be used. <br /> 5. Prepare IDOT forms for contract documents. <br /> 6. Prepare pre-final and final document package for submittal. The submittals will consist <br /> of the following: <br /> a. Pre-final: One (1) 11"x17' set of plans, special provisions, cost estimate and <br /> estimate of time to IDOT District 7; One(1)hard copy and electronic copy to <br /> City of Decatur. <br /> b. Final Plans: One (1) set—full size plan mylars, special provisions, cost estimate, <br /> estimate of time, IDOT markups, and disposition of comments to IDOT District <br /> 7; One(1) hard copy of submittal and electronic copy to City of Decatur. <br /> 7. Respond to questions during bidding phase. <br /> 8. Provide assistance to City of Decatur during bidding phase <br /> Task 00700—Prepare Right-of-Way Documents <br /> The following work will be included in this task: <br /> 1. Conduct right-of-way survey <br /> 2. Prepare/check legal descriptions <br /> 3. Prepare/check plats <br /> 4. Submit four(4) sets of plats and legal descriptions to the City of Decatur. <br /> 6-8-11 A-3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.