My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2011-106 AUTHORIZING AN AGREEMENT WITH URS CORPORATION
COD
>
City Clerk
>
RESOLUTIONS
>
2011
>
R2011-106 AUTHORIZING AN AGREEMENT WITH URS CORPORATION
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/1/2015 10:24:26 AM
Creation date
9/1/2015 10:24:22 AM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R2011-106
Res Ord Title
AUTHORIZING AN AGREEMENT WITH URS CORPORATION FOR ENGINEERING SERVICES TO DESIGN THE FINAL PHASE FOR REPLACEMENT OF THE SOUTH SHORES BRIDGE OVER SAND CREEK ARM OF LAKE DECATUR
Department
Public Works
Approved Date
7/5/2011
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
42
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Exhibit A <br /> Task 00800—OA/OC <br /> The following key tasks will be performed as part of a comprehensive project specific QA/QC plan: <br /> 1. Detailed checking(QC reviews)by a second person who is experienced, knowledgeable, <br /> and actively engaged in the project on a day-to-day basis will be made for all <br /> deliverables. <br /> 2. Prior to making submittals, independent technical reviews (QA reviews)will be made of <br /> deliverables. <br /> 3. All project correspondence will be logged, filed, and maintained in a central file. <br /> 4. Copies of all outgoing and incoming transmittals and submittals will be logged and <br /> stored in a centralized file. <br /> 5. Copies of all incoming and outgoing e-mail correspondence will be saved and <br /> maintained in a single centralized project e-mail database. <br /> 6. Disposition of all review comments from internal QC and QA reviews and review <br /> comments on submittals by outside parties will be made using a color coding system <br /> applied to hard copies of review comments with those hard copy dispositions logged, <br /> filed, and stored in a centralized project QA/QC file. <br /> Task 00900—Construction Phase <br /> The following tasks will be performed: <br /> 1. Respond to requests for information(RFIs)during the fabrication process. <br /> 2. Shop drawings will be checked. When all sheets are approved, shop drawings will be <br /> distributed to the following: <br /> a. Fabricator <br /> b. IDOT Inspector <br /> c. City Engineer <br /> d. Contractor <br /> e. IDOT Engineer of Materials <br /> f. IDOT District 7 <br /> 3. Twelve (12) hours have been budgeted to answer questions during the construction <br /> phase. Additional hours to respond to construction questions will need to be negotiated <br /> with the City of Decatur. <br /> Task 01000— Sanitary Sewer—City of Decatur <br /> Work related to sanitary sewer service under the jurisdiction of the City of Decatur will be tracked <br /> under cost code 01000. Bainbridge, Gee, Milanski & Associates (BGM)will act as a subconsultant <br /> to URS and assist with developing the methods and details for maintaining service to local <br /> residents. The following tasks will be performed by BGM: <br /> 6-8-11 A-4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.