My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2011-106 AUTHORIZING AN AGREEMENT WITH URS CORPORATION
COD
>
City Clerk
>
RESOLUTIONS
>
2011
>
R2011-106 AUTHORIZING AN AGREEMENT WITH URS CORPORATION
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/1/2015 10:24:26 AM
Creation date
9/1/2015 10:24:22 AM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R2011-106
Res Ord Title
AUTHORIZING AN AGREEMENT WITH URS CORPORATION FOR ENGINEERING SERVICES TO DESIGN THE FINAL PHASE FOR REPLACEMENT OF THE SOUTH SHORES BRIDGE OVER SAND CREEK ARM OF LAKE DECATUR
Department
Public Works
Approved Date
7/5/2011
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
42
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Exhibit A <br /> Task 01000-Sanitary Sewer-City of Decatur ' <br /> Subconsultants <br /> Bainbridge,Gee, Milanski&Assoc: * $37,035.00 x 1.02 = $37,775.70 <br /> * See Sheet A-10 <br /> Classification <br /> Task Activity Project Eng 1 Eng 2 Structural Tech Surveyor PLS Landscape Electrical <br /> Manager E ineer Architect Engineer Totals <br /> 20000 Sanity Sewer <br /> Meet with Property Owners 4.0 4.0 <br /> Coordinate with City and SDD 8.0 8.0 <br /> Landscaping Details-Caceres'Property 8.0 12.0 20.0 <br /> Incorporate Sanitary Sewer Details into Plans 12.0 12.0 <br /> Design/Check Sheet Pile Retaining Wall 40.0 12.0 2.0 54.0 <br /> Sheet Pile Wall Details all cap,fend 16.0 40.0 56.0 <br /> Design/Check Sewer Pipe Bridge Superstr 40.0 16.0 2.0 58.0 <br /> Design/Check Sewer Pipe Bridge Substr 40.0 16.0 2.0 58.0 <br /> Draft Sewer Pipe Bridge Superstr Details 6.0 32.0 38,0 <br /> Draft Sewer Pipe Bridge Substr Details 6.0 32.0 38.0 <br /> Pi Bridge Quantities&Cost Est 16.0 4.0 1.0 21.0 <br /> Total this Task 12.0 164.0 1 48.0 7.0 124.0 0.0-1 0.0 1 12.0 0.0 367.0 <br /> Raw Rates $61.04 1 $31.30 1 $26.25 $61.04 $31.50 $29.00 $55.04 $51.00 $55.08 <br /> Raw Labor-This Task $732.48 1 $5,133.20 1 $1,260.00 $427.28 $3,906.001 $0.00 7 $0.00 $612.00 $0.00 $12,070.96 <br /> Direct Costs-Task 20000 <br /> Mileage(Meetings): 4 trip(s)x 6 miles/trip @ $0.510 /mile = $12.24 <br /> Mileage(Landscape Architect): 1 trip(s)x 356 miles/trip @ $0.510 /mile = $181.56 <br /> Meals: $20.00 <br /> Total-Direct Costs: $213.80 <br /> Subconsultants-Task 20000 <br /> Bainbridge,Gee, Milanski&Assoc: * $19,301.00 x 1.02 = $19,687.02 <br /> * See Sheet A-11 <br /> Labor: $12,070.96 x 2.70 = $32,591.59 <br /> $52,492.41 <br /> Estimated Fee-Work Related to 30"Sanitary Sewer Raise Not to Exceed= $52,500.00 (Task 20000) <br /> w/o written approval <br /> Total Estimated Fee <br /> Labor: [$47,726.52 + $12,070.96] x 2.70 = $161,453.20 <br /> Direct Costs: <br /> Postage: $75.00 <br /> Task 20000 Direct Costs: $213.80 <br /> Subconsultants: $37,775.70 + $19,687.02 = $57,462.72 <br /> $219,204.72 <br /> Total Estimated Fee Not to Exceed= $219,200.00 <br /> w/o written approval <br /> A-9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.