My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2011-106 AUTHORIZING AN AGREEMENT WITH URS CORPORATION
COD
>
City Clerk
>
RESOLUTIONS
>
2011
>
R2011-106 AUTHORIZING AN AGREEMENT WITH URS CORPORATION
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/1/2015 10:24:26 AM
Creation date
9/1/2015 10:24:22 AM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R2011-106
Res Ord Title
AUTHORIZING AN AGREEMENT WITH URS CORPORATION FOR ENGINEERING SERVICES TO DESIGN THE FINAL PHASE FOR REPLACEMENT OF THE SOUTH SHORES BRIDGE OVER SAND CREEK ARM OF LAKE DECATUR
Department
Public Works
Approved Date
7/5/2011
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
42
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Exhibit A <br /> Classification <br /> Task Activity Project Eng 1 Eng 2 Structural Tech Surveyor PLS Landscape Electrical - <br /> Mana er E ineer Architect En ineer Totals <br /> 00500 Top of Slab Elevations-Plan 2.0 8.0 10.0 <br /> (Cont.) Top of Slab Elevations-Tables 2.0 8.0 10.0 <br /> Top of West Approach Slab Elevations 1.0 4.0 5.0 <br /> Top of East Approach Slab Elevations 1.0 4.0 5.0 <br /> Superstructure Details-Plan&Section 16.0 24.0 40.0 <br /> Superstructure Details-Parapets,etc 8.0 24.0 32.0 <br /> Diaphragm Details Abutment 12.0 24.0 36.0 <br /> Approach Slab Details BA-0,Sit 1 1.0 4.0 5.0 <br /> Approach Slab Details BA-0,Sit 2 2.0 1 4.0 6.0 <br /> Steel Framing Plan 8.0 24.0 32.0 <br /> Structural Steel Details 12.0 28.0 40.0 <br /> West Abutment 8.0 24.0 32.0 <br /> East Abutment 6.0 16.0 22.0 <br /> Pier with Cofferdam Details 8.0 24.0 32.0 <br /> Pile Details 1.0 2.0 3.0 <br /> Bar Splicer Assembly Details BSD-1 2.0 2.0 <br /> Cantilever Forming Brackets SB-1 2.0 2.0 <br /> Concrete Parapet Sli formi Option SFP-34) 2.0 2.0 <br /> Boring 1.0 6.0 7.0 <br /> Sheet Pile Wall Details all cap,fencing) - - 0.0 <br /> Sewer Pipe Bridge Superstructure Details - - 0.0 <br /> Sewer Pipe Bridge Substructure Details - - 0.0 <br /> Cross Sections 8.0 32.0 40.0 <br /> Total this Task 0.0 219.0 6.0 0.0 428.0 0.0 0.0 0.0 8.0 661.0 <br /> 00600 Quantities-Estimates-Special Prov <br /> Calculate/Check R /Brid a Quantities 24.0 16.0 40.0 80.0 <br /> Develop/Check Cost Estimate 12.0 2.0 14.0 <br /> Develop/Check Estimate of Time 6.0 2.0 8.0 <br /> Prepare Special Prov/IDOT Forms 24.0 6.0 30.0- <br /> Prepare <br /> 0.0Pre re Pre-final&Final Packages for Submittal 8.0 8.0 16.0 <br /> Bidding Phase Questions/Assistance 6.0 6.0 12.0 <br /> Total this Task 6.0 80.0 26.0 0.0 48.0 0.0 0.0 0.0 0.0 160.0 <br /> 00700 ROW Documents <br /> FiO-WSLrTy 32.0 32.0 <br /> Prepare/Check Plats&Legals 32.0 6.0 38.0 <br /> Total this Task 0.0 0.0 0.0 0.0 0.0 64.0 6.0 0.0 0.0 70.0 <br /> 00800 QNQC <br /> ITR-Bridge Plans 24.0 24.0 <br /> ITR-Roadway Plans 24.0 24.0 <br /> Total this Task 24.0 0.0 0.0 24.0 0.0 0.0 0.0 0.0 0.0 48.0 <br /> 00900 Construction Phase <br /> Respond to Request's for Information RFls 6.0 4.0 10.0 <br /> Check/Distribute Shop Drawings 32.0 4.0 36.0 <br /> Respond to Construction Questions 6.0 6.0 12.0 <br /> Total this Task 0.0 44.0 0.0 14.0 0.0 0.0 0.0 0.0 0.0 58.0 <br /> Manhour Total 1 61.0 634.0 122.0 50.0 485.0 64.0 6.0 0.0 8.0 1430.0 <br /> Raw Rates 1 $61.04 $31.30 $26.25 $61.04 $31.50 $29.00 $55.04 $51.00 $55.08 <br /> Subtotal-Raw Laborl $3,723.44 $19,844.20 $3,202.50 $3,052.00 $15,277.50 $1,856.00 $330.24 $0.00 $440.64 1 $47,726.52 <br /> A-8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.