Laserfiche WebLink
Exhibit A <br /> URS Corporation <br /> Prepared By: KWB Date: 6J8/2011 <br /> Checked By: Date: <br /> City of Decatur-Replacement of South Shore Drive Bridge over Sand Creek Amt of Lake Decatur(SN 058-6003) <br /> Tasks,Manhour and Fee Estimate-Phase II Engineering <br /> Classification <br /> Task Activity Project Eng 1 Eng 2 Structural Tech Surveyor PLS Landscape Electrical <br /> Manager Engineer Architect En ineer Totals <br /> 00100 Project Management <br /> Prepare Project Iritiation Forms 8.0 8.0 <br /> Prepare PXP 3.0 3.0 <br /> Project Kickoff Meeting 2.0 1.0 1.0 1.0 5.0 <br /> Project Administration/Invoicing 6.0 6.0 <br /> Pro"ect Coordination/Management 12.0 2.0 2.0 2.0 18.0 <br /> Total this Task 31.0 3.0 3.0 0.0 3.0 0.0 0.0 0.0 0.0 40.0 <br /> 00200 Update Hydraulic Report <br /> Update Hydraulics for Raised Bridge 16.0 4.0 20.0 <br /> Total this Task 0.0 16.0 4.0 0.0 0.0 0.0 0.0 0.0 0.0 20.0 <br /> 00300 Structure Design <br /> Design/Check Superstructure-Beams 40.0 16.0 2.0 1 58.0 <br /> Desion/Check Slab 6.0 2.0 0.5 8.5 <br /> Design/Check-Shear Stud Layout 16.0 4.0 1.0 21.0 <br /> Design/Check-Beam Splice 32.0 8.0 1.0 41.0 <br /> Design/Check Fixed Bearing at Pier 4.0 2.0 0.5 6.5 - <br /> Develop/Check <br /> .5Devel /Check Slab Elevations 20.0 6.0 1.0 27,0 <br /> Desigrt/Check Deck Drainage System 8.0 3.0 0.5 11.5 <br /> Design/Check Abutments 40.0 12.0 1.0 53,0 <br /> Design/Check Pier 32.0 8.0 1.0 1 41.0 <br /> SeismsDesign/Check 32.0 8.0 3.0 43.0 <br /> Design/Check Cofferdam 24.0 8.0 0.5 32.5 <br /> Design/Check Sheet Pile Retaining Wall - - - 0.0 <br /> Total this Task 0.0 254.0 77.0 12.0 0.0 0.0 0.0 0.0 0.0 343.0 <br /> 00400 Roadway Design <br /> Determine Pavement Section 12.0 4.0 16.0 <br /> Prepare/Check Detour Phan 6.0 2.0 6.0 14.0 <br /> Total this Task 0.0 18.0 6.0 0.0 6.0 0.0 0.0 0.0 0.0 30.0 <br /> 00500 Prepare Plans <br /> Cover Sheet 4.0 8.0 12.0 <br /> Summary of Quantities Gen.Notes 12.0 24.0 36.0 <br /> Typical Sections 4.0 16.0 20.0 <br /> Schedule of Quantities 8.0 24.0 32.0 <br /> Horizontal Layout 3.0 16.0 19.0 <br /> Plan&Profile Sheet 4.0 20.0 24.0 <br /> Storm Water Pollution Prevention Plan 32.0 6.0 1 24.0 62.0 <br /> Sanitary Sewer Details(BGM) - - 1 0.0 <br /> Residential Pump Station Details(BGM) - - 0.0 <br /> Roadway Lighting Plan 16.0 4.0 20.0 <br /> Roadway Lighting Details 16.0 4.0 20.0 <br /> Landscaping Details-Caceres'Property - - 0.0 <br /> General Plan&Elevation(Rdwy Bride 4.0 12.0 16.0 <br /> General Notes, Bill of Material,SM Index 16.0 12.0 1 28.0 <br /> Substructure Layout 3.0 6.0 1 9.0 <br /> A-7 <br />