Laserfiche WebLink
Exhibit A <br /> 15. Coordinate with BGM and incorporate sewer and pumping station details/drawings into <br /> total plan set <br /> 16. Design/check sheet pile wall to be included along north side of roadway. Design will <br /> include sheet pile cap and fencing. <br /> 17. Draft Sheet Pile Retaining Wall Details —wall, cap, fencing <br /> 18. Design/check pipe bridge superstructure and prepare plan sheets <br /> 19. Design/check pipe bridge substructure and prepare plan sheets <br /> 20. Prepare/check opinion of probable cost for sewer pipe bridge <br /> 6-8-11 A-6 <br />