My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2011-94 AUTHORIZING AN AGREEMENT WITH HOMER L. CHASTAIN & ASSOCIATES, LLP
COD
>
City Clerk
>
RESOLUTIONS
>
2011
>
R2011-94 AUTHORIZING AN AGREEMENT WITH HOMER L. CHASTAIN & ASSOCIATES, LLP
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/1/2015 10:51:53 AM
Creation date
9/1/2015 10:51:39 AM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R2011-94
Res Ord Title
AUTHORIZING AN AGREEMENT WITH HOMER L. CHASTAIN & ASSOCIATES, LLP FOR THE PRELIMINARY DESIGN OF THE FRANKLIN STREET PORTION FOR THE DOWNTOWN STREETSCAPE AND OPEN SPACE ENHANCEMENT PROGRAM
Department
Public Works
Approved Date
6/20/2011
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
102
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Scope of Services—Civil Design Homer L. Chastain& Associates, LLP <br /> Downtown Decatur Streetscape May 31, 2011 <br /> Franklin Street Corridor Page 1 of 3 <br /> Chastain will be responsible for the following work items: <br /> Franklin Street Corridor—Phase 1 <br /> Homer L. Chastain&Associates, LLP (Chastain) will lead the plan preparation. Massie <br /> Massie &Associates (MMA)will be a subconsultant to Chastain and will be responsible <br /> for the landscaping portion of the work. Architectural Expressions, LLP (AEX)will be a <br /> subconsultant to Chastain and will be responsible for the lighting and electrical portion of <br /> the work. <br /> All work shall conform to the IDOT BLR Manual for projects with Federal participation. <br /> 1. Topographic surveys of the entire corridor <br /> a. Horizontal control <br /> i. Recover horizontal control used for the Reynolds Block <br /> development. <br /> ii. Set 20 intervisable new control points with GPS using double <br /> occupation and traverse with total station. <br /> iii. Tie into Water Street control and adjust to same datum. <br /> b. Vertical control <br /> i. Recover Benchmarks used for the Reynolds Block development. <br /> ii. Set new benchmarks throughout project. <br /> c. Locate property corners <br /> i. Locate visible property corners. <br /> d. Cross section roadways - 107 sections 80 feet wide. <br /> i. Cross section roadways at 50 foot intervals to develop existing <br /> DTM. <br /> ii. Assume Franklin St is 2,000 feet with an additional 2,825 feet of <br /> side streets for a total of 4,825 feet. <br /> iii. Assume 10% additional sections as needed for DTM accuracy <br /> e. Locate drainage structures and measure inverts <br /> i. Locate center of casting or grate. <br /> ii. Identify type of structure, frame and lid. <br /> iii. Measure pipe inverts and diameters. <br /> f. Locate and measure trees <br /> i. Locate center of tree. <br /> ii. Measure tree diameter in accordance with Article 201.10(b)(1) of <br /> the IDOT Standard Specifications. <br /> g. Building ground floor elevations including steps and ramps <br /> i. Locate position and elevation of exterior door thresholds. <br /> ii. Locate all steps and ramps. <br /> h. Record topographic data <br /> i. Light poles <br /> ii. Water valves <br /> iii. Gas valves <br /> 1:\Municipalities\City_of Decatur\5690_Franklin_Streetscape\Management\Franklin St Scope 5-31-11.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.