My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2011-83 APPROVING EXPENDITURE OF FUNDS
COD
>
City Clerk
>
RESOLUTIONS
>
2011
>
R2011-83 APPROVING EXPENDITURE OF FUNDS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/1/2015 2:21:46 PM
Creation date
9/1/2015 2:21:46 PM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R2011-83
Res Ord Title
APPROVING EXPENDITURE OF FUNDS FOR THE PURCHASE OF PEDESTRIAN STREET LIGHT POLES AND LUMINAIRES
Department
Public Works
Approved Date
6/6/2011
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• R <br /> • March 7, 2011 —Council approved Resolution R2011-20 authorizing a$354,238.43 <br /> Professional Services Agreement between the City of Decatur and Phillip W. Cochran <br /> Engineering to design streetscape improvements for the Water Street corridor between <br /> Eldorado Street and Wood Street. <br /> • April 4, 2011 —Council was given a presentation on the proposed downtown streetscape <br /> improvement program in Study Session. <br /> BACKGROUND: <br /> Pedestrian Street Light Pricing Agreement <br /> In conjunction with the reconstruction of the 300 block of North Water Street in 2008, proposals <br /> were sought from street light manufacturers to provide ornamental street light fixtures for <br /> downtown streetscape improvements. Three vendors provided proposals. Sternberg Lighting of <br /> Roselle, Illinois, provided the most competitive pricing and was the only vender able to meet the <br /> City's desired appearance for both poles and luminaires. <br /> In order to assure stable pricing for that project and proposed future streetscape work, the City <br /> entered into a 10 year pricing agreement with Sternberg. The pricing agreement was tied to the <br /> Producer Price Index published by the U.S. Department of Labor and the current market price for <br /> aluminum. <br /> Downtown Streetscape and Open Space Enhancement <br /> The first phase of the Water Street Streetscape project advertized for bids on May 25th. The first <br /> phase includes the 300 and 400 blocks of North Water Street along with the 200 block of East <br /> North Street and will use just over 30 pedestrian street lights. The pedestrian lights installed on <br /> the east side of the 300 block of North Water Street in 2008 will be the predominant light used <br /> on the Water Street corridor which extends from Eldorado Street on the north to Wood Street on <br /> the south. It is anticipated that between 110 and 130 pedestrian lights will be needed on the <br /> entire Water Street corridor in addition to those that will be used in the streetscape work for the <br /> Main and Franklin Street corridors. Staff proposes to purchase an initial lot of 40 street lights to <br /> qualify for a 5% quantity discount. <br /> Future purchases will be proposed as the design work progresses and the construction schedule is <br /> more firmly established. It is necessary to purchase the lights ahead of the construction project <br /> due to the long lead time in receiving the lights. In past projects, delivery times have been 4 to 6 <br /> months. However, ordering hundreds of lights too far ahead of construction could have the City <br /> storing them for long periods. <br /> POTENTIAL OBJECTION: There are no known objections to this resolution. <br /> INPUT FROM OTHER SOURCES: Massie Massie and Associates <br /> STAFF REFERENCE: Richard G. Marley, Public Works Director and Matt Newell, City <br /> Engineer. Richard Marley will be in attendance at the City Council meeting to answer any <br /> questions of the Council on this item. <br /> Page 12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.