My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2011-82 APPROVING CHANGE ORDER TO AGREEMENT WITH HOMER L. CHASTAIN & ASSOCIATES, LLP
COD
>
City Clerk
>
RESOLUTIONS
>
2011
>
R2011-82 APPROVING CHANGE ORDER TO AGREEMENT WITH HOMER L. CHASTAIN & ASSOCIATES, LLP
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/1/2015 2:23:43 PM
Creation date
9/1/2015 2:23:42 PM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R2011-82
Res Ord Title
APPROVING CHANGE ORDER TO AGREEMENT WITH HOMER L. CHASTAIN & ASSOCIATES, LLP FOR DESIGN SERVICES FOR THE MAIN STREET PORTION OF THE CITY'S DOWNTOWN STREETSCAPE & OPEN SPACE ENHANCEMENT PROGRAM
Department
Public Works
Approved Date
6/6/2011
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Change Order 1—Scope of Work Page 1 of 2 <br /> Downtown Streetscape—Main Street <br /> Traffic Analysis <br /> Traffic Analysis <br /> The City of Decatur has requested Chastain perform a traffic analysis of the downtown <br /> area to document the effects of changes proposed in the planning stages of the Downtown <br /> Streetscape Projects. <br /> Project Area <br /> The area of study will consist of the street network bounded by and including Eldorado <br /> Street to the north, Wood Street to the south, Main Street to the west and Franklin Street <br /> to the east. <br /> Methods <br /> The analysis will look at the downtown system as a whole. Chastain has a variety of <br /> traffic analysis software in-house. This software is will be used to refine proposed <br /> models through"what-if' scenarios and can model a wide variety of different intersection <br /> types. The level of service(LOS)calculated for intersections along Main and Franklin <br /> streets will conform to IDOT accepted Highway Capacity Manual methods. <br /> Project Scope <br /> This analysis will consist of the following scope of work for the specified project area <br /> using the specified methods: <br /> Existing Traffic Model <br /> 1. Compile existing traffic count data <br /> a. Information from the Truck Study <br /> b. Information from IDOT <br /> c. Information from the City <br /> 2. Develop turning movement traffic counts <br /> 3. Build existing street network in software <br /> 4. Set street network parameters in software <br /> 5. Load existing signal timing data into the software <br /> 6. Run and refine model to match current observations <br /> a. Refine software settings <br /> b. Refine traffic producing nodes <br /> c. Refine traffic collection nodes <br /> IAMwicipalities\City_of Decattn\5679 Change Order l Scope-Traffic Analyssdoc <br />
The URL can be used to link to this page
Your browser does not support the video tag.