Laserfiche WebLink
Change Order 1 —Scope of Work Page 2 of 2 <br /> Downtown Streetscape—Main Street <br /> Traffic Analysis <br /> Proposed Model <br /> 7. Project proposed downtown traffic information based on new truck route <br /> 8. Develop turning movement traffic based on new projections <br /> 9. Set street network parameters based on new projections in software <br /> 10. Refine traffic signal timing <br /> 11. Run and refine model <br /> a. Refine intersection/signalization types <br /> b. Refine traffic producing nodes for direction changes <br /> c. Refine traffic collection nodes for direction changes <br /> 12. Publish results <br /> a. Intersection level of service(LOS) <br /> b. Queue length results <br /> c. Note any concerns <br /> d. State all assumptions <br /> Items needed from the City <br /> 1. Traffic count information(to supplement data available from IDOT) <br /> 2. Existing signal timing at all signalized intersections within the project area <br /> a. Individual timing <br /> b. Any interconnect timing info <br /> 3. Proposed lane configurations on Main and Franklin streets <br /> 4. Any proposed traffic circulation changes <br /> a. Direction changes to one-way streets <br /> b. Changes to one-way from two-way streets <br /> c. Changes from two-way to one-way streets <br /> 5. Any proposed changes to intersection signalization <br /> a. Intersection types <br /> b. Any signals to be removed <br /> c. Any new signals <br /> 6. Any proposed changes to turn lanes <br /> 1AMunicipalifies\City_of Decatw15679 Change Order 1 Scope-Traffic Analyskdoc <br />