Laserfiche WebLink
�� Page 3 <br /> City of Decatur,IL <br /> CMOM and Consent Order Compliance Program <br /> Task 2: SANITARY SEWER MASTER PLAN REVIEW <br /> The purpose of this task is to review the City's May 2010 Sanitary Sewer Master Plan (SSMP) and <br /> track the status of the recommended improvements. <br /> See Order, paragraph 43. <br /> 2.1 Review the SSMP and confirm the recommendations and prescribed projects not limited to the <br /> following: <br /> 2.1.1 Critical Large Diameter Sewer Rehabilitation. The critical large diameter sewers include <br /> those ranging from 3 to 7 feet in diameter, where failure would have dire consequences, such <br /> as loss of service for a large number of customers, pollution of the environment, very high <br /> repair costs, or significant property damage. <br /> 2.1.2 Overhead Sewer Program. Review and modify the Overhead Sewer Program to increase <br /> participation in the program. <br /> 2.1.3 Elimination of Sanitary Sewer Discharges due to I/I. This work will include preparation of the <br /> Sewer Collection System Alternatives Analysis (SCSAA) (Task 4) and Capacity, <br /> Management, Operation and Maintenance (CMOM) Program (Task 5). <br /> 2.2 Review schedule and cost of the improvements. <br /> 2.3 Prepare a SSMP Technical Memorandum (TM) to the City, documenting the review and <br /> recommended updates. <br /> Deliverables <br /> • SSMP TM <br /> • Meetings (1) <br />