My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2011-01 AUTHORIZING CONTRACT - SINGLE STREAM RECYCLING PROGRAM
COD
>
City Clerk
>
RESOLUTIONS
>
2011
>
R2011-01 AUTHORIZING CONTRACT - SINGLE STREAM RECYCLING PROGRAM
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/1/2015 10:56:47 AM
Creation date
10/1/2015 10:56:46 AM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R2011-01
Res Ord Title
AUTHORIZING CONTRACT - SINGLE STREAM RECYCLING PROGRAM - MIDWEST FIBER INC. OF DECATUR
Department
Development Services
Approved Date
1/18/2011
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Saturdays 7 am to 5:00 pm (only if required as stated in section 7 of this contract) <br /> The scale and recyclables tipping floor operation must: <br /> • Have electronic reporting capabilities for the scale as needed to meet the electronic <br /> format reporting requirements as identified in other sections of this contract; <br /> • Provide paper weight tickets for each delivered load (if Contractor scales are improperly <br /> working or in need of maintenance, the Contractor will be responsible for material <br /> weighing including payment at an alternative location and will need to provide a weight <br /> ticket); <br /> • Accommodate tipping of material at a rate such that trucks delivering City recyclables are <br /> able to approach the site, enter, weigh in, tip all materials and depart the site with a turn- <br /> around time of less than 30 minutes (inclusive of actual time ejecting load); and <br /> • Accommodate at least three days storage of City material delivered by the Contractor, <br /> such that Contractor processing equipment breakdowns will not result in service <br /> disruptions. <br /> Section 6.Single Stream Processing System <br /> The Contractor must provide an up-front separation and processing system for recyclable <br /> materials that cleans and separates the fiber and container streams through mechanical and <br /> manual techniques fed by conveyor belts and feed pits. Floor sortin of an sin le stream <br /> g Y g <br /> recyclable material is not an acceptable single stream separation system for the purposes of this <br /> Contract. <br /> Section 7.City Collection Schedule <br /> 7.1 Operation Daily Schedule: <br /> The Contractor shall perform the services specified under the contract in a manner that <br /> accommodates the City's recycling collection and Holiday Collection schedules. The <br /> City's recycling collection program regularly operates Monday through Friday between <br /> the hours of 6:00 a.m. and 6:00 p.m. Hours, days and dates of collection are subject to <br /> change and the Contractor is responsible for adapting to any changes to the City's <br /> collection schedule. <br /> 7.2 Holiday Collection Schedule: <br /> The Holiday Collection Schedule will be based on the City's approved holiday schedule. <br /> On certain collection holidays, Hauler shall not deliver recyclable materials to the <br /> SSMRF/RTF. The City will provide the Contractor with an updated Holiday Collection <br /> Schedule on an annual basis. <br /> 7.3 Make-Up Days: <br /> Collection operations are conducted five days each week. Occasionally, Saturday <br /> collection operations will occur to make up for an observed holiday during the week. <br /> 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.