Laserfiche WebLink
' 1 • ,� d�� � � � , _ _� <br /> Siemens scope is limited to the supply of the preventative maintenance work detailed below at <br /> the Decatur Water facility in Decatur IL. <br /> Equipment Identification <br /> Epuiqment to be Tested: <br /> Water Plant: <br /> X1 3750KVA with primary switch <br /> X2 3750 KVA with primary switch <br /> Entrance gear: <br /> Qty (5) 5kV breakers w/meters and relays <br /> Qty (2) PT sections w/meters and relays <br /> X3 Drytype w/ MC breaker <br /> X4 Drytype w/MC breaker <br /> AmpGard Starters: <br /> Qty (11)4160V starters with meters <br /> Qty (5) 4160V Loadbreak switches <br /> Raw Water end: <br /> X5 5000VA with MC breaker <br /> X6 5000VA with MC breaker <br /> Qty(A�)Ampgard 4160V starters with meters <br /> Qty(5)4160V Loadbreak switches <br /> Siemens Energy 8� Automation, Inc. <br /> Process Solutions Division 2220 W Altorter Dr. Tel: (309)696-0535 www.sea.siemens.com/engineer <br /> Industrial Services Business Unit Peoria,IL 61615 Fax:(678)297-8535 <br />