My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2010-239 AUTHORIZING AGREEMENT WITH DECATUR INDUSTRIAL ELECTRIC, INC.
COD
>
City Clerk
>
RESOLUTIONS
>
2010
>
R2010-239 AUTHORIZING AGREEMENT WITH DECATUR INDUSTRIAL ELECTRIC, INC.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/1/2015 11:30:46 AM
Creation date
10/1/2015 11:30:44 AM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R2010-240
Res Ord Title
AUTHORIZING AGREEMENT WITH DECATUR INDUSTRIAL ELECTRIC, INC.
Department
Water
Approved Date
12/20/2010
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
0 . ' � • �� � � � �.. <br /> Scope of Work <br /> Disconnect Switches—Medium Voltage <br /> Mechanical Inspection <br /> • Inspect physical and mechanical condition. <br /> • Verify appropriate equipment grounding. <br /> • Verify correct blade alignment, blade penetration,travel stops, and mechanical operation. <br />' • Verify that each fuse holder has adequate mechanical support. <br /> • Test all interlocking systems for correct operation and sequencing. <br /> • Inspect insulating assemblies for evidence of physical damage or contaminated surfaces. <br /> • Exercise all active components. <br /> • Verify all indicating and control devices. <br /> • Lubrication <br /> ✓ Verify appropriate contact lubricant on moving current-carrying parts. <br /> ✓ Verify appropriate lubrication on moving and sliding surtaces. <br /> Electrical Testinq <br /> • Perforrn insulation-resistance tests across each open pole for one minute. <br /> . Measure contact-resistance across each switchblade and fuse-holder. <br /> Liquid Filled Transformers <br /> Mechanical Inspection <br /> • Inspect physical and mechanical condition. <br /> + Verify correct liquid level in all tanks and bushings. <br /> � Verify that positive pressure is maintained on nitrogen-blanketed transformers <br /> • Verify correct equipment grounding. <br /> Electrical Testinq <br /> • Insulation Resistance Test(Megger) <br /> . Transformer Tums Ratio Test at the designated tap position <br /> Siemens Energy 8� Automation, Inc. <br /> Process Solutions Division 2220 W Altorfer Dr. Tel: (309)696-0535 www.sea.siemens.com/engineer <br /> Industrial Senrices Business Unit Peoria,IL 61615 Fax:(678)297-8535 <br />
The URL can be used to link to this page
Your browser does not support the video tag.