My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2010-206 AUTHORIZING EXECUTION OF CHANGE ORDER NO. 1
COD
>
City Clerk
>
RESOLUTIONS
>
2010
>
R2010-206 AUTHORIZING EXECUTION OF CHANGE ORDER NO. 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/2/2015 10:23:03 AM
Creation date
10/2/2015 10:23:03 AM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R2010-206
Res Ord Title
AUTHORIZING THE EXECUTION OF CHANGE ORDER NO.1 FOR WATER SYSTEM IMPROVEMENTS PHASE II CONSTRUCTION CONTRACT
Department
Water
Approved Date
10/21/2010
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
STRANG <br /> ASSOCIATES, INCg <br /> E N G I N E E R S <br /> 910 West Wingra Drive <br /> Madison,WI 53715 September 28, 2010 <br /> Phone:608-251-4843 <br /> Fax:608-251-8655 <br /> Office Locations <br /> CHANGE ORDER NO. 1 <br /> Madison,WI <br /> Joliet,IL <br /> Louisville,KY <br /> Lexington,KY pROJECT: Water S stem Im rovements—Phase II <br /> Mobile,AL y p <br /> Columbus, IN OWNER: City of Decatur, Illinois <br /> Columbus,OH CONTRACT: W06-t�3 <br /> Indianapolis,IN <br /> Milwaukee,WI CONTRACTOR: Christy-Foltz, Inc. <br /> Cincinnati,OH <br /> Phoenix,AZ <br /> Description of Change <br /> www.strand.com <br /> la Delete VFDs from carbon feed system control DEDUCT ($ 1,376.60) <br /> panel and install manufacturer-furnished <br /> VFDs. <br /> lb Provide additional panel at Division and ADD $ 3,239.00 <br /> Garfield Elevated Tanks for devices <br /> connected to water tap. <br /> lc Provide 363-day time extension. NO CHANGE $ 0.00 <br /> 1 d Install second radio antenna at Garfield ADD $ 2,626.00 <br /> Elevated Tank. <br /> le Install antenna at the SWTP above the roo£ ADD $ 1,834.00 <br /> lf Rewire controls for polymer transfer pumps ADD $ 1,503.00 <br /> to accommodate existing 120 V pumps. <br /> 1� Vdire chlorine leak signal into SCC-1 A for ADD $ 2,752.00 <br /> monitoring at the SCADA System. <br /> lh Contingency allowance. DEDUCT ($50,000.00) <br /> 1 i Refeed hot water pump that was fed through ADD $ 966.00 <br /> junction box to be removed. <br /> 1 j Wire encoders on PAC feeders No. 3 and 4. ADD $ 952.00 <br /> lk Provide low level float in polyphosphate ADD $ 2,581.00 <br /> mixing tank and wire float to shut down <br /> polyphosphate transfer pumps. <br /> TOTAL VALUE OF THIS CHANGE ORDER: DEDUCT ($34,923.60) <br />� <br />
The URL can be used to link to this page
Your browser does not support the video tag.