Laserfiche WebLink
Brush College Road/NS Crossing Study Exhibit A <br /> Engineering Manhour and Fee Estimate <br /> Prirtcipal Project Sr.Struct Struct Sr.Civii Civil Givil Senior Sr.7rans. Planner! = T�affic Track Tech Env. Surveyar Surveyor Geotech Geotech MH Avg Raw Factored< <br /> Task Mana er En ineer En ineer En ineer En .1 En .2 En ineer Pianner Pub.inv. €n ineer Desi ner En ineer I 2 1 2 Totals Rate Labor Labor <br /> Collect/Process Traffic Data(00100) <br /> Pre are Data Collection Plan 0.0 1.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 1.0 $59.44 $59.44 $162.90 <br /> Obtain 24-Hour Traffic Counts 0.0 2.0 0.0 0.0 2.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 8.0 0.0 0.0 0.0 0.0 0.0 12.0 $39.25 $471.04 $1.290.89 <br /> Obtain Intersection Turnin Movements 0.0 1.5 0.0 0.0 1.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 48.0 0.0 0.0 0.0 0.0 0.0 50.5 $32.26 $1.629.24 $4.464.93 <br /> Obtain At-Grade Rail Crossin Activit 0.0 0.5 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.5 $59.44 $29.72 $81.45 <br /> Process Traffic Data 0.0 1.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 1.0 $59.44 $59.44 $162.90 <br /> Total This Task 0.0 6.0 0.0 0.0 3.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 56.0 0.0 0.0 0.0 0.0 0.0 65.0 $34.60 $2,248.88 $6,163.06 <br /> To o ra hic Surve 00120) <br /> Pre are Surve Outline 0.0 4.0 0.0 2.0 2.0 0.0 0.0 0.0 0.0 0.0 0.0 2.0 0.0 0.0 0.0 0.0 0.0 0.0 10.0 $49.36 $493.60 $1.352.71 <br /> Surve Coordination/Schedule Fla er 0.0 3.0 0.0 0.0 3.0 0.0 3.0 0.0 0.0 0.0 0.0 4.0 0.0 0.0 4.0 0.0 0.0 0.0 17.0 $39.74 $675.60 $1.851.48 <br /> To o ra hic Surve 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 336.0 336.0 0.0 0.0 672.0 $28.00 $18,816.00 $51,565.25 <br /> Process/Plot Surve Data 0.0 1.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 40.0 0.0 6.0 0.0 0.0 0.0 47.0 $30.84 $1.449.44 $3,972.19 <br /> Total This Task 0.0 8.0 0.0 2.0 5.0 0.0 3.0 0.0 0.0 0.0 0.0 6.0 40.0 0.0 346.0 336.0 0.0 0.0 746.0 $28.73 $21.434.64 $58.741.63 <br /> Data Collection (00140 <br /> Pre are Mosaic Base Sheets from Aerial Tiles 0.0 1.0 0.0 0.0 1.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 8.0 0.0 0.0 0.0 0.0 0.0 10.0 $35.95 $359.52 $985.26 <br /> Tax Ma Research 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 8.0 0.0 0.0 0.0 8.0 $25.00 $200.00 $548.10 <br /> Review/Extract Information from GIS Database 0.0 1.0 0.0 0.0 2.0 4.0 0.0 0.0 0.0 0.0 0.0 0.0 32.0 0.0 0.0 0.0 0.0 0.0 39.0 $32.30 $1.259.60 $3.451.93 <br /> Site Photo ra h &Reconnaisance 0.0 0.0 0.0 0.0 0.0 12.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 8.0 0.0 0.0 0.0 20.0 $25.60 $512.00 $1.403.14 <br /> Add Information to Base Sheets 0.0 1.0 0.0 0.0 1.0 32.0 6.0 0.0 0.0 0.0 0.0 0.0 40.0 0.0 0.0 0.0 0.0 0.0 80.0 $30.10 $2.407.68 $6.598.25 <br /> Identif Utilities 0.0 4.0 0.0 0.0 6.0 0.0 48.0 0.0 0.0 0.0 0.0 0.0 22.0 0.0 0.0 0.0 0.0 0.0 80.0 $37.82 $3.025.52 $8.291.44 <br /> Obtain/Review Public/School Bus Routes 0.0 2.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 2.0 $59.44 $118.88 $325.79 <br /> Identif Potential Environmental Im acts 0.0 0.0 0.0 0.0 0.0 0.0 0.0 6.0 0.0 0.0 0.0 0.0 8.0 8.0 0.0 0.0 0.0 0.0 22.0 $31.82 $700.00 $1,918.35 <br /> Total This Task 0.0 9.0 0.0 0.0 10.0 48.0 54.0 6.0 0.0 0.0 0.0 0.0 110.0 8.0 16.0 0.0 0.0 0.0 261.0 $32.89 $8.583.20 $23.522.26 <br /> Stakeholderinterviews (00160 <br /> Pre are Questionaire 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 4.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 4.0 $40.68 $162.72 $445.93 <br /> Set U Internet Questionaire 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 8.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 8.0 $40.44 $323.52 $886.61 <br /> Process Questionaire Res onse 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 8.0 16.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 24.0 $40.52 $972.48 $2,665.08 <br /> Meet with Stakeholders 21.0 164.0 0.0 47.0 37.0 4.0 61.0 0.0 0.0 0.0 0.0 44.0 8.0 0.0 0.0 0.0 0.0 0.0 386.0 $49.58 $19,138.84 $52,449.99 <br /> Total This Task 21.0 164.0 0.0 47.0 37.0 4.0 61.0 0.0 12.0 24.0 0.0 44.0 S.0 0.0 0.0 0.0 0.0 0.0 422.0 $48.81 $20.597.56 $56,447.61 <br /> Traffic Anal sis 00200 <br /> Existin Conditions Traffic Anal sis <br /> Document Current Issues 0.0 1.0 0.0 0.0 0.0 0.0 0.0 0.0 12.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 13.0 $42.12 $547.60 $1,500.70 <br /> Determine Existin Level of Service 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 8.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 8.0 $39.71 $317.68 $870.60 <br /> Pre areiRun VISSIM Model-Existin Cond. 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 80.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 80.0 $39.71 $3.176.80 $8.706.02 <br /> Future Conditions Traffic Anal sis <br /> Identif Planned Develo ment 0.0 2.0 0.0 0.0 0.0 0.0 0.0 0.0 12.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 14.0 $43.36 $607.04 $1,663.59 <br /> Develo Future Traffic Volumes 0.0 1.0 0.0 0.0 0.0 0.0 0.0 0.0 20.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 21.0 $41.57 $873.04 $2,392.57 <br /> Determine Future Level of Service 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 4.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 4.0 $39.71 $158.84 $435.30 <br /> Pre are/Run VISSIM Model-Future Cond. 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 20.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 20.0 $39.71 $794.20 �2.176.51 <br /> Document Alternative Trans ortation Issues 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 8.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 8.0 $40.68 $325.44 $891.87 <br /> Im rovement Alternatives Traffic Anal sis <br /> Evaluate Im rovement Scenarios 0.0 2.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 100.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 102.0 $40.10 $4,089.88 $11.208.32 <br /> Document Alternative Trans ortation Im acts 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 12.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 12.0 $40.68 $488.16 $1.337.80 <br /> Document Traffic Results 0.0 1.0 0.0 0.0 0.0 0.0 0.0 0.0 16.0 0.0 4.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 21.0 $41.39 $869.16 $2.381.93 <br /> Intersection Desi n Studies <br /> Evaluate Intersections 0.0 0.0 0.0 0.0 20.0 20.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 40.0 $39.04 $1.561.60 $4.279.56 <br /> Develo Intersection La outs 0.0 0.0 0.0 0.0 24.0 48.0 0.0 0.0 0.0 0.0 0.0 0.0 28.0 0.0 0.0 0.0 0.0 0.0 100.0 $33.66 $3,365.92 $9,224.30 <br /> Total This Task 0.0 7.0 0.0 0.0 44.0 68.0 0.0 0.0 80.0 0.0 216.0 0.0 28.0 0.0 0.0 0.0 0.0 0.0 443.0 $38.77 $17,175.36 $47,069.07 <br /> Location Draina e Stud (00300) <br /> Identif Existin Oraina e S stem 0.0 2.0 0.0 0.0 0.0 4.0 24.0 0.0 0.0 0.0 0.0 0.0 30.0 0.0 0.0 0.0 0.0 0.0 60.0 $34.16 $2.049.52 $5.616.71 <br /> Develo Pro osed Draina e S stem 0.0 0.0 0.0 0.0 0.0 24.0 60.0 0.0 0.0 0.0 0.0 0.0 32.0 0.0 0.0 0.0 0.0 0.0 116.0 $33.26 $3.857.60 $10.571.75 <br /> Draina e Stud -Selected Alternative 0.0 2.0 0.0 0.0 0.0 30.0 52.0 0.0 0.0 0.0 0.0 0.0 22.0 0.0 0.0 0.0 0.0 0.0 106.0 $33.24 $3,523.60 $9,656.43 <br /> Total This Task 0.0 4.0 0.0 0.0 0.0 58.0 136.0 0.0 0.0 0.0 0.0 0.0 84.0 0.0 0.0 0.0 0.0 0.0 282.0 $33.44 $9,430.72 $25.844.89 <br /> Scope 6-4-10 A-18 <br />