Laserfiche WebLink
Brush College Road/NS Crossing Study Exhibit A <br /> Engineering Manhour and Fee Estimate <br /> Principal ProJect Sr.Struct Struct Sr.Civik Givil Civil Senior Sr.Trans. Piannerf Traffic Track Tech Env. Surveyor Surveyor Geotech Geotech MH Avg Raw Factored <br /> Sask Mana er En ineer En ineer Engineer En .1 Eng.2 En ineer Pianner Pub.inv. En ineer Desi ner En ineer i 2 1 2 Totafs- Rate Labor Labor <br /> Alternate Geometric Studies 00400) <br /> Establish Desi n Criteria 0.o 1.0 0.0 0.0 1.0 0.0 0.0 0.0 2.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 4.0 $48.22 $192.88 $528.59 <br /> Perform Bic cle Facilities Assessment 0.0 0.0 0.0 0.0 1.0 8.0 0.0 0.0 0.0 0.0 0.0 0.0 1.0 0.0 0.0 0.0 0.0 0.0 10.0 $29.11 $291.08 $797.70 <br /> Determine Cross Section Elements 0.0 1.0 0.0 0.0 4.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 2.0 0.0 0.0 0.0 0.0 0.0 7.0 $47.11 $329.76 $903.71 <br /> Ali nment and Geometric Studies 0.0 0.0 2.0 0.0 48.0 24.0 0.0 0.0 0.0 0.0 0.0 0.0 64.0 0.0 0.0 0.0 0.0 0.0 138.0 $37.87 $5226.72 $14,323.83 <br /> Profile Studies 0.0 0.0 2.0 0.0 32.0 16.0 0.0 0.0 0.0 0.0 0.0 0.0 32.0 0.0 0.0 0.0 0.0 0.0 82.0 $38.94 $3.193.44 $8.751.62 <br /> Cross Section Studies 0.0 2.0 0.0 0.0 16.0 48.0 0.0 0.0 0.0 0.0 0.0 0.0 48.0 0.0 0.0 0.0 0.0 0.0 114.0 $32.35 $3.688.16 $10.107.40 <br /> Develo T ical Cross Sections 0.0 2.0 0.0 0.0 8.0 8.0 0.0 0.0 0.0 0.0 0.0 0.0 32.0 0.0 0.0 0.0 0.0 0.0 50.0 $34.71 $1,735.52 $4.756.19 <br /> Stud iDevelo Plan for Side Streets 0.0 4.0 0.0 0.0 80.0 48.0 0.0 0.0 0.0 0.0 0.0 0.0 32.0 0.0 0.0 0.0 0.0 0.0 164.0 $40.51 $6,644.16 $18.208.32 <br /> Plot ROW/Evaluate Im acts 0.0 2.0 0.0 0.0 24.0 16.0 0.0 0.0 0.0 0.0 0.0 0.0 24.0 0.0 0.0 0.0 0.0 0.0 66.0 $38.32 $2.528.80 $6.930.18 <br /> Evaluate Utilit /Pi in Im acts 0.0 4.0 0.0 24.0 0.0 48.0 120.0 0.0 0.0 0.0 0.0 0.0 80.0 0.0 0.0 0.0 0.0 0.0 276.0 $34.40 $9,495.36 $26,022.03 <br /> Develo JU date Preliminar Cost Estimate 0.0 2.0 0.0 0.0 32.0 48.0 48.0 0.0 0.0 0.0 0.0 0.0 80.0 0.0 0.0 0.0 0.0 0.0 210.0 $34.79 $7.306.72 $20.024.07 <br /> Railroad Track Studies 0.0 6.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 216.0 0.0 0.0 0.0 0.0 0.0 0.0 222.0 $32.98 $7.320.48 $20.061.78 <br /> Develo /U date Preliminar Cost Est.-Railroad 0.0 0.0 0.0 0.0 0.0 16.0 0.0 0.0 0.0 0.0 0.0 48.0 0.0 0.0 0.0 0.0 0.0 0.0 64.0 $30.68 $1.963.52 $5.381.03 <br /> Meetin /Exhibit Pre aration 0.0 2.0 0.0 0.0 16.0 24.0 0.0 0.0 0.0 0.0 0.0 0.0 32.0 0.0 0.0 0.0 0.0 0.0 74.0 $34.70 $2.568.16 $7.038.04 <br /> Submit Prelim.Geometric Plan-Selected Alt. 0.0 2.0 0.0 0.0 24.0 4.0 12.0 0.0 0.0 0.0 0.0 12.0 16.0 0.0 0.0 0.0 0.0 0.0 70.0 $40.06 $2.804.00 $7,684.36 <br /> Incor orate Review Comments/Refine Plan 0.0 1.0 0.0 0.0 16.0 4.0 6.0 0.0 0.0 0.0 0.0 4.0 8.0 0.0 0.0 0.0 0.0 0.0 39.0 $40.97 $1,597.84 $4.378.88 <br /> Review Warrants for Li htin 0.0 0.0 0.0 0.0 0.0 0.0 24.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 24.0 $37.36 $896.64 $2.457.24 <br /> Submit Final Geometrics Plan-Selected Alt. 0.0 1.0 0.0 0.0 2.0 1.0 1.0 0.0 0.0 0.0 0.0 1.0 4.0 0.0 0.0 0.0 0.0 0.0 10.0 $38.32 $383.20 $1.050.16 <br /> Total This Task 0.0 30.0 4.0 24.0 304.0 313.0 211.0 0.0 2.0 0.0 0.0 281.0 455.0 0.0 0.0 0.0 0.0 0.0 1624.0 $35.82 $58,166.44 $159.405.13 <br /> Traffic Maintenance Anal sis (00500) <br /> Review Traffic Data 0.0 0.0 0.0 0.0 1.0 0.0 2.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 3.0 $42.27 $126.80 $347.50 <br /> Under ass O tion at NS Crossin 0.0 0.0 2.0 0.0 8.0 0.0 27.0 0.0 0.0 0.0 0.0 0.0 8.0 0.0 0.0 0.0 0.0 0.0 45.0 $39.83 $1.792.24 $4.911.63 <br /> Over ass O tion at NS Crossin 0.0 0.0 0.0 0.0 10.0 0.0 23.0 0.0 0.0 0.0 0.0 0.0 16.0 0.0 0.0 0.0 0.0 0.0 49.0 $38.29 $1.876.08 $5.141.40 <br /> Over ass at Faries Parkwa 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 #DIV/0! $0.00 $0.00 <br /> MOT Summa -Selected Aiternate 0.0 1.0 0.0 0.0 2.0 0.0 22.0 0.0 0.0 0.0 0.0 0.0 16.0 0.0 0.0 0.0 0.0 0.0 41.0 $36.13 $1.481.52 $4,060.11 <br /> Total This Task 0.0 1.0 2.0 0.0 21.0 0.0 74.0 0.0 0.0 0.0 0.0 0.0 40.0 0.0 0.0 0.0 0.0 0.0 138.0 $38.24 $5,276.64 $14,460.63 <br /> Structure Studies (00600) <br /> Roadwa Under ass at NS Yard 0.0 0.0 32.0 184.0 0.0 64.0 0.0 0.0 0.0 0.0 0.0 0.0 90.0 0.0 0.0 0.0 2.0 8.0 380.0 $38.92 $14.788.48 $40.527.83 <br /> Roadwa Over ass at NS Yard 0.0 0.0 38.0 186.0 0.0 90.0 0.0 0.0 0.0 0.0 0.0 0.0 86.0 0.0 0.0 0.0 2.0 8.0 410.0 $38.50 $15.784.32 $43,256.93 <br /> Rebuilt CN Under ass w/Over ass O tion 0.0 2.0 41.0 124.0 0.0 74.0 0.0 0.0 0.0 0.0 0.0 0.0 90.0 0.0 0.0 0.0 2.0 4.0 337.0 $38.45 $12,958.32 $35.512.28 <br /> Roadwa Over ass at Faries Parkwa 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 #DIV/0! $0.00 $0.00 <br /> Total This Task 0.0 2.0 111.0 494.0 0.0 228.0 0.0 0.0 0.0 0.0 0.0 0.0 266.0 0.0 0.0 0.0 6.0 20.0 1127.0 $38.63 $43,531.12 $119.297.03 <br /> Environmental Studies 00700 <br /> Identi Existin /Future Land Use 0.0 1.0 0.0 0.0 0.0 4.0 0.0 24.0 0.0 0.0 0.0 0.0 16.0 0.0 0.0 0.0 0.0 0.0 45.0 $37.05 $1,667.44 $4.569.62 <br /> Assess Social/Economic Conditions 0.0 2.0 0.0 0.0 0.0 0.0 0.0 32.0 0.0 0.0 0.0 0.0 6.0 0.0 0.0 0.0 0.0 0.0 40.0 $41.22 $1.648.88 $4.518.76 <br /> Pre are ESRFiEcoCAT 0.0 1.0 0.0 0.0 0.0 16.0 0.0 0.0 0.0 0.0 0.0 0.0 8.0 0.0 0.0 0.0 0.0 0.0 25.0 $28.94 $723.44 $1.982.59 <br /> Historic Preservation Com liance Documentation 0.0 1.0 0.0 0.0 0.0 24.0 0.0 16.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 41.0 $33.06 $1.355.44 $3,714.58 <br /> Investi ate Flood lain Im acts 0.0 0.0 0.0 0.0 0.0 6.0 32.0 0.0 0.0 0.0 0.0 0.0 8.0 0.0 0.0 0.0 0.0 0.0 46.0 $34.77 $1.599.52 $4.383.48 <br /> Evaluate Noise Im acts 0.0 2.0 0.0 0.0 0.0 0.0 0.0 114.0 0.0 0.0 0.0 0.0 16.0 0.0 0.0 0.0 0.0 0.0 132.0 $40.93 $5.402.88 $14.806.59 <br /> Develo Cultural Resource Summar 0.0 1.0 0.0 0.0 0.0 6.0 0.0 24.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 31.0 $39.47 $1.223.44 $3,352.84 <br /> Evaluate 4(f Im acts 0.0 1.0 0.0 0.0 0.0 6.0 0.0 32.0 0.0 0.0 0.0 0.0 6.0 0.0 0.0 0.0 0.0 0.0 45.0 $38.79 $1.745.44 $4.783.38 <br /> S ecial Waste Review/Pre are PESA 4.0 1.0 0.0 0.0 0.0 0.0 0.0 38.0 0.0 0.0 0.0 0.0 6.0 94.0 0.0 0.0 0.0 0.0 143.0 $31.13 $4.451.44 $12,199.17 <br /> Threatened/Endan ered S ecies Coordination 0.0 1.0 0.0 0.0 0.0 4.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 5.0 $32.69 $163.44 $447.91 <br /> Wetiand Delineation and Miti ation 0.0 1.0 0.0 0.0 0.0 0.0 0.0 24.0 0.0 0.0 0.0 0.0 12.0 40.0 0.0 0.0 0.0 0.0 77.0 $31.68 $2.439.44 $6.685.29 <br /> Total This Task 4.0 12.0 0.0 0.0 0.0 66.0 32.0 304.0 0.0 0.0 0.0 0.0 78.0 134.0 0.0 0.0 0.0 0.0 630.0 $35.59 $22.420.80 $61.444.20 <br /> Public Involvement(00800 <br /> Schedule/Advertise Meetin #1 0.0 4.0 0.0 0.0 0.0 2.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 6.0 $48.29 $289.76 $794.09 <br /> Pre are Exhibits-Meetin #1 0.0 6.0 0.0 0.0 2.0 12.0 0.0 0.0 2.0 0.0 0.0 0.0 16.0 0.0 0.0 0.0 0.0 0.0 38.0 $35.53 $1.350.16 �3.700.11 <br /> Hold Public Meetin #1 6.0 6.0 0.0 6.0 6.0 6.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 30.0 $49.22 $1.476.72 $4.046.95 <br /> CollecUSummarize Comments-Meetin #1 0.0 12.0 0.0 0.0 0.0 8.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 20.0 $46.06 $921.28 $2.524.77 <br /> Consult/Pre are Exhibits-Cit Public Meetin s 0.0 6.0 0.0 6.0 6.0 6.0 6.0 0.0 0.0 0.0 0.0 0.0 24.0 0.0 0.0 0.0 0.0 0.0 54.0 $38.05 $2.054.88 $5.631.40 <br /> Schedule/Advertise Meetin #2 0.0 4.0 0.0 0.0 0.0 2.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 6.0 $48.29 $289.76 $794.09 <br /> Pre are Exhibits-Meetin #2 0.0 6.0 0.0 0.0 2.0 12.0 0.0 0.0 2.0 0.0 0.0 0.0 16.0 0.0 0.0 0.0 0.0 0.0 38.0 $35.53 $1.350.16 $3.700.11 <br /> Hold Public Meetin �2 6.0 6.0 0.0 6.0 6.0 6.0 0.0 0.0 6.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 36.0 $47.80 $1.720.80 $4.715.85 <br /> CollecVSummarize Comments-Meetin #2 0.0 12.0 0.0 0.0 0.0 8.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 20.0 $46.06 $921.28 $2.524.77 <br /> Total This Task 12.0 62.0 0.0 18.0 22.0 62.0 6.0 0.0 10.0 0.0 0.0 0.0 56.0 0.0 0.0 0.0 0.0 0.0 248.0 $41.83 $10.374.80 $28.432.14 <br /> Scope 6-4-10 q_�g <br />