Laserfiche WebLink
Exhibit A <br /> Brush College Road/NS Crossing Study <br /> Collect/Process Traffic Data <br /> Principal Project Sr.Struct Struct Sr,Givi1 ` Givil Civil Senior Sr.Trans. Planner/ Traffic Track Tech Env, Surveyor Surveyor Geotech Geotech MH <br /> Task Mana er En ine�r En ineer En ineer En .1 En .2 En ineer Planner, Pub.Inv. En ineer Desi ner En ineer 1 2 1 2 Totals <br /> Collect/Process Traffic Data 00100 <br /> Pre are Data Collection Plan 1.0 1.0 <br /> Obtain 24-Hour Traffic Counts 2.0 2.0 8.0 12.0 <br /> Obtain Intersection Turnin Movements 2 3 1.5 1.0 0.0 48.0 50.5 <br /> Obtain At-Grade Rail Crossin Activit 4 0.5 0.5 <br /> Process Traffic Data 1.0 1.p <br /> Total This Task 0.0 6.0 0.0 0.0 3.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 56.0 0.0 0.0 0.0 0.0 0.0 65.0 <br /> Assumptions <br /> (1) Assumes City/County/IDOT will provide signal timing for William Street and Faries Parkway. <br /> (2) Crawford, Bunte, Brammeier-Glen Carbon, IL will perform turning movement traffic counts. URS will provide 6 people to assist with counts. <br /> (3) Assume 3 hours a.m. and 3 hours p.m. Include 1 hour for travel/setup in a.m.and p.m. (8 hours for each counter). <br /> Assume 6 people x 8.0 hours = 48.0 hours @ Tech rate <br /> (4) Assuming actual rail crossing data will be collected as part of intersection counts. Stakeholder interviews will provide additional information on train activity. <br /> (5) It is understood that the turning movement traffic counts may not be taken until the Fall of 2010,when school is back in session. <br /> Direct Costs <br /> Mileage to Site: 3 trips x 12 miles /trip Qa 0.50/mile = $18.00 (Assume 3 vehicles) <br /> Total Direct Costs This Task: $18.00 <br /> Subconsultant Costs <br /> Crawford, Bunte, Brammeier: $9,500.00 x 1.10 = $10,450.00 <br /> Total Subconsultant Costs This Task: $10,450.00 <br /> Scope 6-4-10 A-21 <br />