Laserfiche WebLink
Exhibit A <br /> Brush College Road/NS Crossing Study <br /> Topographic Survey <br /> Principal Project Sr.Struct Struet Sr.Civil Civil Civil Senior Sr_Trans. Pfianner/ Traffic Track Tech Env. Surveyor Surveyor Geotech Geotech MH <br /> Task Mana er En ineer En inesr En ineer En .1 En .2 En ineer Planner Pub.Inv. En ineer Desi ner En ineer 1 2 1 2 Totals <br /> To o ra hic Surve 00120 <br /> Pre are Surve Outline 4.0 2.0 2.0 2.0 10.0 <br /> Surve Coordination/Schedule Fla er 3.0 3.0 3.0 4.0 4.0 17.0 <br /> Set Control 2 40.0 40.0 80.0 <br /> Roadwa To 0 3 160.0 160.0 320.0 <br /> Under ass To 0 4 16.0 16.0 32.0 <br /> NS Rail Yard Surve 5 120.0 120.0 240.0 <br /> Subtotal-To o ra hic Surve 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 336.0 336.0 0.0 0.0 672.0 <br /> Process/Plot Surve Data 1.0 40.0 6.0 47.0 <br /> Total This Task 0.0 8.0 0.0 2.0 5.0 0.0 3.0 0.0 0.0 0.0 0.0 6.0 40.0 0.0 346.0 336.0 0.0 0.0 746.0 <br /> Assumptions <br /> (1) Assume 2-man crew <br /> {2) Assume 5 days to set topo control. 5 x 8 x 2=80 hours <br /> (3) Assume 20 days for roadway topo 20 x 8 x 2=320 hours <br /> (4) Assume 2 days for underpass topo 2 x 8 x 2=32 hours <br /> (5) Assume 15 days to topo NS Yard.Additional time due to trains in yard. 15 x 8 x 2= 240 <br /> Direct Costs <br /> Mileage to Site: 42 trips x 12 miles /trip @ 0.50/mile = $252.00 <br /> RR Flagger: 17 days @ $800 /day= $13,600.00 <br /> Per Diem: 42 days x 2 men @ 10.00/day = $840.00 <br /> RR Liability Insurance: $10,000.00 <br /> Total Direct Costs This Task: $24,692.00 <br /> Scope 6-4-10 A-22 <br />