Laserfiche WebLink
Exhibit A <br /> Brush College Road/NS Crossing Study <br /> Traffic Maintenance Analysis <br /> Principal Projecf Sr.Struct Struet Sr.Civil Civil Civi1 Senior Sr:Trans. Pianner/ Traffic Track Tech Env. Surveyor Surveyor Geotech Geotech MH <br /> Task Mana er En ineer 'En ineer En ineer En .1 En .2 En ineer Planner Pub.Inv. En ineer Desi ner En ineer i 2 1 2 Totals <br /> Traffic Maintenance Anal sis 00500 <br /> Review Traffic Data 1.0 2.0 3.0 <br /> Under ass O tion at NS Crossin 0.0 <br /> Evaluate Traffic Im acts 2.0 2.0 8.0 12.0 <br /> Develo Traffic Maintenance Alternatives 1 4.0 16.0 8.0 28.0 <br /> Evaluate Pedestrian/Bic cle Accommodations 1.0 2.0 3.0 <br /> Evaluate Need for Wide Load Detour 1.0 1.0 2.0 <br /> Develo Preliminar Cost Estimate 0.0 <br /> Subtotal2 0.0 0.0 2.0 0.0 8.0 0.0 27.0 0.0 0.0 0.0 0.0 0.0 8.0 0.0 0.0 0.0 0.0 0.0 45.0 <br /> Over ass O tion at NS Crossin <br /> Evaluate Traffic Im acts 4.0 8.0 12.0 <br /> Develo Traffic Maintenance Alternatives 1 4.0 12.0 16.0 32.0 <br /> Evaluate Pedestrian/Bic cle Accommodations 1.0 2.0 3.0 <br /> Evaluate Need for Wide Load Detour 1.0 1.0 2.0 <br /> Develo Preliminar Cost Estimate 0.0 <br /> Subtotal3 0.0 0.0 0.0 0.0 10.0 0.0 23.0 0.0 0.0 0.0 0.0 0.0 16.0 0.0 0.0 0.0 0.0 0.0 49.0 <br /> Over ass at Faries Parkwa <br /> Evaluate Traffic Im acts 0.0 <br /> Develo Traffic Maintenance Alternatives 1 0.0 <br /> Evaluate Pedestrian/Bic cle Accommodations 0.0 <br /> Evaluate Need for Wide Load Detour 0.0 <br /> Develo Preliminar Cost Estimate 0.0 <br /> Subtotal4 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 <br /> MOT Summar -Selected Alternate <br /> Pre are Summa Statement 0.0 <br /> Com ile Traffic Characteristics 0.0 <br /> Provide Desi n Information 0.0 <br /> List Alternatives and Recommendation 1.0 2.0 16.0 19.0 <br /> Pre are for Plannin and Review Meetin s 6.0 16.0 22.0 <br /> Address Comments/Submit Final Re ort 0.0 <br /> Subtotal 5 0.0 1.0 0.0 0.0 2.0 0.0 22.0 0.0 0.0 0.0 0.0 0.0 1 6.0 0.0 0.0 0.0 0.0 0.0 41.0 <br /> Total This Task 0.0 1.0 2.0 0.0 21.0 0.0 74.0 0.0 0.0 0.0 0.0 0.0 40.0 0.0 0.0 0.0 0.0 0.0 138.0 <br /> Assumptions <br /> (1) Includes development of alternatives at side streets that may be blocked by construction activities or new structure <br /> Scope 6-4-10 A-29 <br />