Laserfiche WebLink
Exhibit A <br /> Brush College Road/NS Crossing Study <br /> Structure Studies <br /> Principal Projecf Sr.Struct' Struct' Sr. Civii >. Civil Civil Senior Sr.Trans. Pianner/ Traffic Track Tech Env; "Surveyor Surveyor Geotech Geotech MH <br /> Task Mana er En ineer En ineer En ineer En .1 En .2 En ineer Flanner Pub.lnv. En ineer Desi ner En ineer 1 2 1 2 Tatals <br /> Structure Studies 00600 <br /> Roadwa Under ass at NS Yard <br /> Develo Railroad Brid e Desi n Criteria 6.0 6.0 <br /> Determine S an La out and Len th s 4.0 16.0 20.0 <br /> Determine Structure La out for Sta e Const. 8.0 40.0 20.0 68.0 <br /> Preliminar Desi n of Su erstructure 2.0 32.0 8.0 16.0 58.0 <br /> Establish Roadwa Profile Grade 1.0 2.0 3.0 <br /> Determine Substructure Confi uration 4.0 32.0 8.0 16.0 60.0 <br /> Determine Foundation S stem 2.0 16.0 4.0 6.0 1.0 4.0 33.0 <br /> Determine Retainin Wall T e 8.0 32.0 12.0 16.0 1.0 4.0 73.0 <br /> Develo Preliminar Cost Estimate 3.0 8.0 32.0 16.0 59.0 <br /> Subtotall 0.0 0.0 32.0 184.0 0.0 64.0 0.0 0.0 0.0 0.0 0.0 0.0 90.0 0.0 0.0 0.0 2.0 8.0 380.0 <br /> Roadwa Over ass at NS Yard <br /> Determine S an La out 4.0 24.0 8.0 36.0 <br /> Evaluate Su erstructure Alternatives 2.0 16.0 4.0 22.0 <br /> Develo Su erstructure Confi uration 2.0 16.0 4.0 16.0 38.0 <br /> Preliminar Desi n of Su erstructure 4.0 24.0 16.0 44.0 <br /> Establish Roadwa Profile Grade 1.0 2.0 3.0 <br /> Determine Substructure Confi uration 4.0 24.0 12.0 16.0 56.0 <br /> Determine Foundation S stem 2.0 16.0 4.0 6.0 1.0 4.0 33.0 <br /> Determine Retainin Wall T e 8.0 32.0 12.0 16.0 1.0 4.0 73.0 <br /> Develo Methods to Fill Existin Under ass 8.0 24.0 6.0 8.0 46.0 <br /> Develo Preliminar Cost Estimate 3.0 8.0 32.0 16.0 59.0 <br /> Subtotal2 0.0 0.0 38.0 186.0 0.0 90.0 0.0 0.0 0.0 0.0 0.0 0.0 86.0 0.0 0.0 0.0 2.0 8.0 410.0 <br /> Rebuilt CN Under ass w/Over ass O tion <br /> Determine Dis osition of CN Under ass 2.0 2.0 <br /> Ins ect Existin CN Under ass Substructure 2.0 8.0 8.0 12.0 30.0 <br /> Develo Construction Scheme for Under ass 24.0 40.0 12.0 32.0 108.0 <br /> Evaluate Su erstructure Alternatives 3.0 12.0 4.0 19.0 <br /> Develo Su erstructure Confi uration 2.0 8.0 8.0 18.0 <br /> Preliminar Desi n of Su erstructure 2.0 16.0 6.0 24.0 <br /> Determine Substructure Confi uration 3.0 24.0 8.0 16.0 51.0 <br /> Determine Foundation S stem 2.0 8.0 4.0 6.0 2.0 4.0 26.0 <br /> Develo Preliminar Cost Estimate 3.0 8.0 32.0 16.0 59.0 <br /> Subtotal3 0.0 2.0 41.0 124.0 0.0 74.0 0.0 0.0 0.0 0.0 0.0 0.0 90.0 0.0 0.0 0.0 2.0 4.0 337.0 <br /> Roadwa Over ass at Faries Parkwa <br /> Determine S an La out 0.0 <br /> Evaluate Su erstructure Alternatives 0.0 <br /> Develo Su erstructure Confi uration 0.0 <br /> Preliminar Desi n of Su erstructure 0.0 <br /> Establish Roadwa Profile Grade 0.0 <br /> Determine Substructure Confi uration 0.0 <br /> Determine Foundation S stem 0.0 <br /> Determine Retainin Wall T e 0.0 <br /> Develo Preliminar Cost Estimate 0.0 <br /> Subtotal4 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 <br /> Total This Task 0.0 2.0 111.0 494.0 0.0 228.0 0.0 0.0 0.0 0.0 0.0 0.0 266.0 0.0 0.0 0.0 6.0 20.0 1127.0 <br /> Scope 6-4-10 A-30 <br />