Laserfiche WebLink
Exhibit A <br /> Brush College Road/NS Crossing Study <br /> Environmental Studies <br /> Principal Project Sr,Struct Struct;` Sr.Civil Civil Civil Senior Sr.Trans, Pianner/ Traffic Track Tech Env. Surveyor Surveyor Geotech Geotech MH <br /> Task Mana er En ineer En ineer En ineer En .1 En .2 En ineer Planner Pub. lnv. En ineer Desi ner En ineer 1 2 1 2 Totals <br /> Environmental Studies 00700 <br /> Identif Existin lFuture Land Use 1.0 4.0 24.0 16.0 45.0 <br /> Assess Social/Economic Conditions 2.0 32.0 6.0 40.0 <br /> Pre are ESRF/EcoCAT 1.0 16.0 8.0 25.0 <br /> Historic Preservation Com liance Documentation 1.0 24.0 16.0 41.0 <br /> Investi ate Flood lain Im acts 6.0 32.0 8.0 46.0 <br /> Evaluate Noise Im acts 2.0 114.0 16.0 132.0 <br /> Develo Cultural Resource Summa 1.0 6.0 24.0 31.0 <br /> Evaluate 4 f Im acts 1.0 6.0 32.0 6.0 45.0 <br /> S ecial Waste Review/Pre are PESA 4.0 1.0 38.0 6.0 94.0 143.0 <br /> Threatened/Endan ered S ecies Coordination 1.0 4.0 5.0 <br /> Wetland Delineation and Miti ation 1.0 24.0 12.0 40.0 77.0 <br /> Total This Task 4.0 12.0 0.0 0.0 0.0 66.0 32.0 304.0 0.0 0.0 0.0 0.0 78.0 134.0 0.0 0.0 0.0 0.0 630.0 <br /> Direct Costs <br /> Environmental Database Report: $420.00 <br /> PID: $71.00 <br /> Water Level Indicator: $32.00 <br /> GPS Unit: $137.00 <br /> Misc Field Supplies: $75.00 <br /> Postage/Shipping: $370.00 <br /> Total Direct Costs This Task: $1,105.00 <br /> Subcontractor Costs <br /> Drum Disposal Subcontractor: 1 Drum Non-Haz Soils+ 1 Drum Non-Haz Water- $300.00 <br /> Drum Disposal Transportation (Stop Fee): Pickup/Trans 2 Drums Non-Haz Waste $210.00 <br /> Drilling Subcontractor: One Day-6 Borings to 12' $2,100.00 <br /> Analytical Laboratory: 6 soils (SVOCs, VOCs, RCRA Metals, pH) - $2,406.00 <br /> Soil Waste Sample $488.00 <br /> Liquid Waste Sample $33.00 <br /> Total Subcontractor Costs This Task: $5,537.00 <br /> Scope 6-4-10 A-31 <br />