Laserfiche WebLink
EGIZII ELECTRIC INC. <br /> =GIZI1 ELECTRIC INC <br /> �230 W MAIN ST INV# 113711 DATE OF ORDER <br /> �ECATUR, ILLINOIS 62522 EEI JOB# 103007.13 <br /> JOB NAME: <br /> JOB LOCATION: RT 36 &AIRPORT RD <br /> f0 CITY OF DECATUR CUSTOMERS ORDER# STARTING DATE <br /> 2/10/2010 <br /> DESCRIPTION OF WORK <br /> Remove damaged mast arm irom roadway. Remove truss arm from <br /> damaged upright. Remove damaged signals from upright and truss arm. <br /> Take damaged equipment to City, pick-up mast arm upright from Jasper St <br /> 1TY MATERIAL PRIC:E �1M(7UN�t� lot. Repair wiring and anchor boits. instaii mast arm uprighi and Rruss arm <br /> MA upright furnished by (clty) with 2 signals to get intersection back in colors tfor the night. Install the <br /> 3 3 section poly sheils (city) remainder of signals and make final adjustments. <br /> 1 5 section poly shell (city) OTHER CHARGES Hrs. Per Hr Amount <br /> 1 yellow LED ball (city) line truck 8 $ 53.09 $ 424.72 <br /> 1 red LED ball (city) bucket truck 16 $ 21.57 $ 345.12 <br /> 2 green LED balls (city) service truck 19.5 $ 9.40 $ 183.30 <br /> 1 green LED arrow (city) <br /> 3 sets individual signal bracket <br /> mounts (city) TOTAL $ 953.14 <br /> LABOR HRS RATE AMOUNT <br /> 4 rolls 33+tape $ 5.00 $ 20.00 Eubanks 8 $ 71.10 $ 568.80 <br /> 1 5 section poly shell $ 215.00 $ 215.00 Karr 8 $ 57.98 $ 463.84 <br /> 2 sky brackets $ 65.00 $ 130.00 Rigg 8 $ 65.85 $ 526.80 <br /> 2 sets 3 section MA $ 30.00 $ 60.00 Eubanks OT 3.5 $ 98.32 $ 344.12 <br /> mounting brackets Karr OT 2 $ 79.01 $ 158.02 <br /> 2 3 section backplates $ 55.00 $ 110.00 Rigg OT 2 $ 90.59 $ 181.18 <br /> 130 ft-5/c wire $ 0.50 $ 65.00 Eubanks 8 $ 71.10 $ 568.80 <br /> -�G �-iic wire ' $ 0.65 $ 26.00 Karr 8 $ 57.98 $ 463.84 <br /> 30 redwire nuts $ 0.10 $ 3.00 Eubanks 2 $ 71.10 $ 142.20 <br /> 21 ft 3/4"ss banding $ 0.86 $ 18.06 <br /> 6 3/4"ss buckles $ 0.61 $ 3.66 <br /> 1 can WD-40 $ 5.00 $ 5.00 <br /> >UB TOTAL $ 629.00 <br /> 20% MU $ 125.80 TOTAL LABOR $ 3,417.60 <br /> TOTAL MATERIALS $ 754.80 <br /> TOTAL OTHER $ 953.14 <br /> 'OTAL MATERIALS $ 754.80 TAX <br /> TOTAL $ 5,125.54 <br /> VORK ORDERED BY Jerry/mark <br /> �IGNATURE <br />