Laserfiche WebLink
' APPENDIX A <br /> Background <br /> In 2004 The Illinois Department of Transportation notified governmental entities throughout the <br /> State that problems had been detected in precast deck beam bridges. These bridges are strengthened <br /> with cables that have been placed under tension within the concrete beams in order to provide <br /> support for the structure. It had been found in other areas of the State that the tensioned cables <br /> within these bridges can deteriorate to the point of failure while showing few outward signs. At the . <br /> time, IDOT advised an in-depth inspection of these bridges. <br /> Engineers with Chastain completed a review of the City's 5 precast deck beam bridges in 2004 and <br /> determined a need to replace the MacArthur/ Stevens Creek bridge deck at a future date. In April, <br /> 2007, the City requested Chastain to update the structure review prior to a contract for design. The <br /> follow-up inspection by Chastain and the Illinois Department of Transportation(IDOT) indicated � <br /> the need to replace the entire bridge (i.e. deck, superstructure, and substructure including footings). <br /> Their structural review indicated that the bridge is safe for normal traffic; however, a weight <br /> restriction was placed on the bridge in 2007. In a letter issued on October 30, 2009, IDOT required <br /> the City to post further weight restrictions on this bridge. <br /> Due to the critical nature of the MacArthur/ Stevens Creek Bridge to the area residents for <br /> emergency vehicle access, school busses, etc., the City Council, by previous action, determined that • <br /> the bridge should be replaced before more significant weight restrictions are placed on it. <br /> Public Meetings Held <br /> A public meeting was held on September 23, 2008, early in the preliminary design process. A <br /> follow-up public meeting was held on September 17, 2009, to present the final design. <br /> Construction staging was a major topic for both meetings. The public was informed that the bridge � <br /> would be completed half at a time to allow access and Ash Avenue would be closed at MacArthur <br /> during the construction to enable safer traffic operation through the work zone. The Decatur Park <br /> District also presented its plan to construct a bike path under the bridge and extend it along the <br /> north side of Stevens Creek in future years. The future bike trail is accommodated in the bridge <br /> replacement design. <br /> Project Funding " <br /> On April, 14, 2009,the Decatur Urbanized Area Transportation Study(DUATS) allocated $447,408 <br /> in American Reinvestment and Recovery Act (ARRA) funding and $352,592 in Surface <br /> Transportation Urban(STU) funding for a total of$800,000 in Federal funds toward the <br /> replacement of the MacArthur/ Stevens Creek Bridge. At the time of this action, the estimated <br /> construction cost was $1.0 million. <br /> As the final design neared completion a more precise cost estimate was prepared projecting the <br /> project cost to be just under$1.3 million. On November 10, 2009, the DUATS Technical <br /> Committee allocated an additional $240,000 in STU funding for the bridge to bring total Federal <br /> funding to $1,040,000. The City Council authorized an allocation of$260,000 in the Motor Fuel <br /> Tax Funds to cover the City's 20% match. <br /> Page � 4 <br />