My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2010-05 AUTHORIZING AN AMENDMENT TO THE AGREEMENT WITH THE SANITARY DISTRICT OF DECATUR
COD
>
City Clerk
>
RESOLUTIONS
>
2010
>
R2010-05 AUTHORIZING AN AMENDMENT TO THE AGREEMENT WITH THE SANITARY DISTRICT OF DECATUR
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/12/2015 2:39:34 PM
Creation date
10/12/2015 2:39:25 PM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R2010-05
Res Ord Title
AUTHORIZING AN AMENDMENT TO THE AGREEMENT WITH THE SANITARY DISTRICT OF DECATUR FOR THE REHABILITATION OF THE K-MART PLAZA SANITARY SEWER PUMP STATION AND FORCE MAIN
Department
Public Works
Approved Date
2/1/2010
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
�x rr z,6 z! G <br /> AGREEM�NT T'OR CONSTRUCTIDN ENGINE�RING SER�'ICES � <br /> r�R <br /> SANITARY DISTRICT 01+��CATUR <br /> K-MART PUMPING S'�ATI�N It�I'LAC�M�NT <br /> THIS AGIZEEMENT made at Decatur, Illinois,�this day of � � �, 2008 <br /> by and between the Sanitar3� Distriet of Decatur, hereinafter reCerred to as the "DIS'�'RICT" <br /> and Bainbridbe, Gee, Milansld & Associates, Inc., ]C70 South Taylorville Road, Decatur, <br /> Illinois 62521,hereinafier referred to as the "ENGINE�R," WITNESSETH: <br /> The DISTRICT pi-oposed to engage the ENGINE�R to provide professional enguieering <br /> services for the Construction Engineering for the K-Ivlart Pumping Station Replacement Project <br /> hereinafter referred to as the PROJ�CT. The plans and specifications for the PROJECT are <br /> entitled Sanitary District of Decatur, K-Mart Pumping Station Replacement as prepared by the <br /> ENGINEER. <br /> THEIZEFORE, in consideration of these premises and the mutual covenants of the above <br /> described PROJECT: <br /> TI�E ENGINEER AGREES: <br /> 1. Construction Enaineerin� - Furnish services during the construction period generally <br /> comprised of the following: <br /> a. Print plans and specifications for the PROJECT required for bidding and <br /> construction purposes. <br /> b. Answer design related questions during the bidduig and construction period, and <br /> provide assistance to the DIS�'RICT in receiving construction bids, analyze bids <br /> i•eceived and malce recommendations of contract award. <br /> c. Consult with the DISTIZICT and with the Contractor� on interpretation of plans <br /> and specifications regarding any changes under consideration as construction <br /> proceeds. <br /> d. Provide periodical job-site inspection by the Project Engineer, o�� l�is <br /> representatives, during the construction period. <br /> e. Prepare and submit all payment estimates, change ol-ders, records and reports <br /> 1-ec�uired by the DISTRICT. <br /> BGM 08-071 C Pade 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.