Laserfiche WebLink
f. Safe�ual'd tlie llTSTR]CT against defecis and deCicicncies on ihe par( of' tlle <br /> contractor, _but the �NGIN�ER does nol �uarantee tlie ��e1-forma�nce o1� tlle � <br /> coniraci by the contractor. <br /> g. Conduct Cnal ulspectioii of construction and prepare fin�il papers and reporls. <br /> ]7. Revise contract drawings i�o show ]ocalion and n�iui-e of improvemeni as actually <br /> constructe�l and supply "as biiilt" drawuigs consistuig of an eleci7�onic file copy � <br /> and one sei of paper prints to the DISTP.ICT based on i�ecord field drawings <br /> maintained by the DIS�'RiCT. <br /> � � i. � Checl<all shop and worlcing drawings. <br /> j. Review and checic all reports by testing laboratories on equipment and material <br /> tested. <br /> 2. Resident Inspection - Resident Inspection shall not be provided. <br /> 3. Insurance Requirements <br /> The ENGINEER shall procure and maintain, at its expense, insurance of the types and in <br /> tlie minimum amounts stated below: <br /> a. Workman's Compensation Insurance in full compliance with zhe Worlcman's <br /> Cornpensation Act and Employers Liability coverage of not less than as defined <br /> by Illinois State Statutes. <br /> b. Comprehensive General Liability <br /> Bodily Injury $250,000/500,000 each occurrence <br /> Property Damage $250,000 each occunence or <br /> $500,000 Single Limit Liability <br /> c. Comprehensive Automobile Liability <br /> Bodily I�ijury $250,000 single per occurrence <br /> Including Death $500,000 two or�more, per occurrence <br /> Propei-ty Damage $100,000 each occurrence <br /> d. Architects &Engineers <br /> Professional Liability 5�1,000,000 <br /> e. Umbrella over above <br /> Items an c , , <br /> BGM 08-071C Page 2 <br />