My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2010-05 AUTHORIZING AN AMENDMENT TO THE AGREEMENT WITH THE SANITARY DISTRICT OF DECATUR
COD
>
City Clerk
>
RESOLUTIONS
>
2010
>
R2010-05 AUTHORIZING AN AMENDMENT TO THE AGREEMENT WITH THE SANITARY DISTRICT OF DECATUR
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/12/2015 2:39:34 PM
Creation date
10/12/2015 2:39:25 PM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R2010-05
Res Ord Title
AUTHORIZING AN AMENDMENT TO THE AGREEMENT WITH THE SANITARY DISTRICT OF DECATUR FOR THE REHABILITATION OF THE K-MART PLAZA SANITARY SEWER PUMP STATION AND FORCE MAIN
Department
Public Works
Approved Date
2/1/2010
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
. EXHIBIT ' C-1 ' <br /> AGREEMENT FOR CONSTRUCTION ENGINEERING SER�TICES <br /> FOR <br /> SANITARI'DISTRICT OF DECATUR <br /> K-MART PUMP STATION AND FORCE MAIN <br /> THIS AGREEMENT made at Decatur, Illinois, this day of , 2010 <br /> by and between the Sanitary District of Decatur, hereinafter referred to as the "SDD" and <br /> Bainbridge, Gee, Milanski & Associates, Inc., 1670 South Taylorville Road, Decatur, Illinois <br /> 62521, hereinafter referred to as the "ENGINEER," WITNESSETH: <br /> The SDD proposed to engage the ENGINEER to provide professional engineering services for <br /> the Construction Engineering for the K-Mart Pump Station and Force Main Project hereinafter <br /> referred to as the PROJECT. The plans and specifications for the PROJECT are entitled <br /> Sanitary District of Decatur, K-Mart Pump Station and Force Main as prepared by the <br /> ENGINEER. <br /> THEREFORE, in consideration of these premises and the mutual covenants of the above <br /> described PROJECT: <br /> THE ENGINEER AGREES: <br /> 1. Construction Engineering - Furnish services during the construction period generally <br /> comprised of the following: <br /> a. Print plans and specifications for the PROJECT required for bidding and <br /> construction purposes. <br /> b. Answer design related questions during the bidding and construction period, and <br /> provide assistance to the SDD in receiving construction bids, analyze bids <br /> received and make recommendations of contract award. <br /> c. Consult with the SDD and with the Contractor on interpretation of plans and <br /> specifications regarding any changes under consideration as construction <br /> proceeds. <br /> d. Provide periodical job-site inspection by the Project Engineer, or his <br /> representatives, during the construction period. <br /> e. Prepare and submit all payinent estimates, change orders, records and reports <br /> required by the SDD. <br /> BGM 08-071 C Page 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.