My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2009-238 AUTHORIZING EXECUTION OF DECATUR PARK DISTRICT INTERGOVERNMENTAL AGREEMENT
COD
>
City Clerk
>
RESOLUTIONS
>
2009
>
R2009-238 AUTHORIZING EXECUTION OF DECATUR PARK DISTRICT INTERGOVERNMENTAL AGREEMENT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/12/2015 3:38:32 PM
Creation date
10/12/2015 3:38:31 PM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R2009-238
Res Ord Title
AUTHORIZING EXECUTION OF DECATUR PARK DISTRICT INTERGOVERNMENTAL AGREEMENT - DECATUR AIRPORT WATER MAIN IMPROVEMENTS
Department
Water
Approved Date
11/30/2009
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
iLLIN0IS ENV[RONMENTAL PROTECTION AGENCY <br /> DIVISION OF PUBLIC WATER SUPPLIES-PERMIT SECTION <br /> 1421 NORTH GRAND AVENUE, EAST-POST OF�ICE BOX 19276 <br /> SPRINGFIELD, ILLINOIS 62794-9276 <br /> SCHEDULE B-WATER MAlN C�NSTRUCTION <br /> 1. Name af Public Water Supply City of Decatur, iL <br /> 2. Name of Project "Construct Water Main", Decatur Airport <br /> 3. A. Standard Specifications for Water and Sewer Main Construction in Illinois (1986 Edition) [�X <br /> B. Engineer's Approved Specifications on file with this Agency ❑ <br /> C. Pubiic Water Supply's Approvetl Specifications on file with this Agency ❑ <br /> D. Specificatians submitted with the plan documents [�X <br /> 4. Existing papulation served by present supply A�ma� <br /> 5. Population to be served by water main extension Airport <br /> 6. Average daily pumpage from water works (annual basis) �� M GAL <br /> 7. Maximum day pumpage from wa�er works 3a M GAL <br /> 8. Capacify of water wo�Cs 3� MGD <br /> 9. Capacity of raw water source � MGD <br /> 10. Capacity of existing line(s)at point(s)of cannection{s) o•$� MGD <br /> 11. Capacity of proposed water main extension or system 2•16 MGD <br /> 12 Normal expected operating pressure on proposed water main extension 32 PSI <br /> 13. Minimum expected operating pressure on proposed water main e�ensian 2g PSI <br /> 14. Pressure at point af connection at present maximum demand 38 PSI <br /> 15. Calculated pressure at paint of conn�ction under maximum demand conditians after instalfation of water <br /> main. 32 PS! <br /> This Agency is authorized to require this <br /> information uhder (I Iinois Compiled Statutes, 1415 <br /> IL532-0159 ILCS 5/39(1994). Disclosure of ttiis informatio� is ' <br /> requf red unda� Chet Section. Fai I ure to do so may <br /> P1NS56(REV.81�) prevent this form from being proeessed and I <br /> PR�lTEDONRECYCLEDPAPER coulq result in your application bei�g denied. ' <br /> This form has been approved by the Forms I <br /> Mattagemant Center. �' <br />
The URL can be used to link to this page
Your browser does not support the video tag.