Laserfiche WebLink
SCHEDULE B PAGE 2 <br /> 16. Water mains to be installed must be iisted below: <br /> Pipe Size (inches) $ <br /> Total Length (feet} �,8s5 <br /> 17. General material specifica#ians and type of joints <br /> PVC C-900 Pipe in accordance with AVWVA;Joints ASTM F477 <br /> 18. Depth of Cover 42"Min. <br /> 19. Disinfection: <br /> A. Chemical used calcium Hydroch[oride(HTH) <br /> B. ln�iai disinfectant concentration 5o mg� <br /> C. Final disinfectant concentration 25 mgi�. <br /> D. Retention 6me 24 hours <br /> E. Provisions must be made for collection of water samples to be collected for bacteriological analysis on <br /> finro consticutive days taken at 24 hour intervals. <br /> 20. Sewer and Wafer 5eparation: <br /> A. Minimum horizontal and vertical separation requirements of this Agency to be <br /> followed � Yes ❑ No <br /> B. (f"No", explain provisions for protection of water main <br /> 21. List all deviations for this Agency's design criteria&state justification for deviations. <br /> IL 532-0159 <br /> ?INS 56(REV 8199J Pg.2 <br />