My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2009-236 AUTHORIZING REDEVELOPMENT AGREEMENT Pines Shopping Center
COD
>
City Clerk
>
RESOLUTIONS
>
2009
>
R2009-236 AUTHORIZING REDEVELOPMENT AGREEMENT Pines Shopping Center
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/12/2015 3:45:04 PM
Creation date
10/12/2015 3:45:01 PM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R2009-236
Res Ord Title
AUTHORIZING REDEVELOPMENT AGREEMENT NEIMANN HOLDINGS, LLC PINES SHOPPING CENTER
Approved Date
11/30/2009
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
48
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
. <br /> � <br /> h� <br /> � <br /> �� froin receipt,approve or disapprove the Construction Plans for that Phase, after reviewing <br /> q� said plans for compliance with Applicable Law, including but not limited to the life <br /> � safety and zoning regulations, and conformance with the Preliminary Plans and Final Site <br /> � Plan. If the City disapproves the Construction Plans, the Redeveloper shall submit <br /> � revised plans within a reasonable time from the date of rejection. Upon resubmission,the <br /> r�1 City shall review and approve or disapprove such revised plans within ten (10) days of <br /> � submittal. This process shall repeat until the plans are approved by the City. <br /> �t' <br /> ,',; 2.7 Amended Construction Plans. Prior to completion of the Project or any Phase thereof, <br /> p if the Redeveloper desires to make any substantial change in the Construction Plans for a <br /> Q particular Phase which significantly affects the appearance, function, or structural <br /> � integrity of that Phase, the Redeveloper shall submit the proposed change to the City for <br /> its approval. If the Construction Plans, as modified by the proposed change, conform to <br /> the requirements of the Redevelopment Plan and this Agreement, meet Applicable Law <br /> and do not create a fundamental change in the nature, size or aesthetics of that Phase, the <br /> City shall approve the proposed change and notify the Redeveloper in writing of its <br /> approvaL If the City disapproves of such change, it shall notify the Redeveloper in <br /> writing with specificity as to the reasons for the disapproval, in which event the <br /> Redeveloper may submit a revised change within a reasonable time thereafter. This <br /> process shall repeat until the revised plans are approved by the City or the change is <br /> abandoned by the Redeveloper. If such change is not so approved or rejected in writing <br /> within ten (10) working days of receipt of the submission to the City from the <br /> Redeveloper, such change will be deemed approved. <br /> 2.8 Commencement and Completion Requirements. <br /> 2.8.1 Commencement. The Redeveloper shall commence construction of the Project <br /> or any phase thereof no later than October 1,2010. <br /> 2.8.2 Completion. The Redeveloper shall Substantially Complete construction of the I <br /> Project, or any phase thereof, within twelve (12) months after commencement of <br /> construction or other mutually agreeable date. <br /> 2.8.3 Demolition. The Redeveloper shall, pursuant to Applicable Law, cause the <br /> demolition of the existing buildings and structures on the Project Site as reflected <br /> on the Preliminary Plans no later than June 30, 2012. <br /> 2.8.4 Timing of Phases. Not withstanding any requirements set forth in this <br /> Agreement including the demolition requirements set forth in Section 2.8.3 <br /> above, the Redeveloper shall have the earlier of the following to commence the <br /> demolition of the existing buildings and structures and to commence the <br /> construction of all phases of the Project except for the Save. A. Lot store and the <br /> site improvements related thereto: <br /> a. the expiration of leases of tenants in the existing buildings on the Project <br /> Site; <br /> b. the agreement of tenants in the existing buildings on the Project Site to <br /> relocate; or <br /> c. December 1, 2012. <br /> City of Decatur/Pines Shopping Center Redevelopment Agreement 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.