My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2009-203 ACCEPTING THE BID AND AUTHORIZING CONTRACT
COD
>
City Clerk
>
RESOLUTIONS
>
2009
>
R2009-203 ACCEPTING THE BID AND AUTHORIZING CONTRACT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/12/2015 4:38:15 PM
Creation date
10/12/2015 4:38:14 PM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R2009-203
Res Ord Title
ACCEPTING THE BID AND AUTHORIZING THE EXECUTION OF A CONTRACT FOR THE 1,000,000 GALLON COMPOSITE WATER TANK AND BOOSTER PUMP STATION
Department
Public Works
Approved Date
10/19/2009
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BAINBRIDGE M��HA:L H PRICE,a E <br /> STEVEN G BAIN3HIUGE,P E <br /> �EE C4[ ASSOCIATLS� Ii�VC. CNARIES R HUNSWGEP.,P_ <br /> MII.ANSKI ('e»re�dtirt�l:n�;iur•�n H DAVIU HARP,c�: <br /> October 8,2009 <br /> Matt Newell, PE <br /> City En�inecr <br /> (�itv c�i�f)ecatur <br /> #I Gary K. Anderson Plaza <br /> Decatur, IL 62523 <br /> RE: City af Decafur 06-17 <br /> EPA L17-2552 <br /> 1MG Composite Water TowerBooster PS <br /> BGM U1-U38C <br /> Dear Matt: <br /> Bids were rcceived on September 29, 2009 for the new I MG C'omposite Water Tower and South Pressure Zone <br /> [3ooster Pump Station. Three bids were received ranging from $2,588,000 tu $3,147,300. The engineer's estimate for <br /> this project �vas $2,425,850. <br /> The low bidcier is Landmark Structures based out of Pc�rt Worth, Te�as. This company specializes in constructing <br /> compasite water towers. During the design phase of the pmject, Landmark came to Decatur and made a presentation to <br /> city staff and us covering their means and methods of canstruction. <br /> I have contacted the project engineers fmm two recent l.andmark projects, one in Brunswick MD, and the other in <br /> C:de►s,NC. Qoth of these water towers ���ere 1,000,000 gallons, the same size as Decatur's. Each project was completed <br /> within the allocated timeframe. Botl7 the engineers and owners ���ere plcased �vith the towers when ihe work �vas <br /> completed. <br /> I,andmark Structure. is the lo�vest resrcinsive, resp�nsible bidder and it is our recommendation that their bid in the <br /> amo�mt o�$?,588,000 be awarded, pending EPA appraval. <br /> Sincerely, <br /> E3ainbridge, Gee, Milanski & Associates, Inc. <br /> , <br /> S even G. E3ainbridg PE <br /> 1G70 S TAYLORVII.LF FOAD ■ 217/423-8600 ■ FAX 2171423•8677 ■ DECATUF. ILLINOIS 62521 <br />
The URL can be used to link to this page
Your browser does not support the video tag.