My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2009-195 AUTHORIZING THIRD AMENDMENT TO AGREEMENT WITH HANSON PROFESSIONAL SERVICES, INC.
COD
>
City Clerk
>
RESOLUTIONS
>
2009
>
R2009-195 AUTHORIZING THIRD AMENDMENT TO AGREEMENT WITH HANSON PROFESSIONAL SERVICES, INC.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/13/2015 8:13:25 AM
Creation date
10/13/2015 8:13:25 AM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R2009-195
Res Ord Title
AUTHORIZING THIRD AMENDMENT TO AGREEMENT WITH HANSON PROFESSIONAL SERVICES, INC. FOR LAKE DECATUR DAM REPAIRS
Department
Public Works
Approved Date
10/5/2009
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Current Design Services Agreement <br /> The Lake Decatur Dam is a Class 1 structure, as classified by the Illinois Department of Natural <br /> Resources. This classification indicates that failure of the dam would have a high probability of <br /> causing loss of life and/or substantial economic loss. As a condition of the Operating Permit, the <br /> City is required to undertake annual inspections. The annual inspections typically identify <br /> maintenance issues that need to be addressed in future capital projects. <br /> On January 20, 2009,the City Council authorized a design services agreement with Hanson <br /> Professional Services (of Springfield, IL)to develop detailed design drawings and prepare <br /> construction documents for a rehabilitation project to address the recommendations contained in the <br /> annual inspection reports for the past five years. The original scope of work for this agreement <br /> identified four general groups of improvements that were needed: <br /> 1. Repairs to the training wall between gated outlet works and spillway <br /> 2. Repairs to north and south sections of the spillway <br /> 3. Repairs to south abutment and training walls <br /> 4. Repairs to the gated outlet structure. <br /> On Apri120, 2009, the City Council authorized Amendment 1 to the design services agreement to <br /> add work addressing concerns identified in a detailed inspection of the dam. The work added by <br /> Amendment 1 included the rehabilitation of the mechanical systems that raise and lower the sluice <br /> gates on the north side of the dam, replacing the seals for the bascule gates and sluice gates, and the <br /> removal of non-functioning heating units. Work also included the replacement of the hydraulic <br /> cylinders that raise and lower the long bascule gates along the crest of the dam. <br /> On June 4, 2009, the City Council authorized Amendment 2 to the design services agreement to <br /> provide assistance during the bidding process and the construction phase for the work that was <br /> proposed to be completed over the summer of 2009. <br /> Staff recommends authorizing Amendment 3 which will revise the scope of services to <br /> accommodate the postponement of the construction project, and prepare for the work to be rebid for <br /> Spring/Summer 2010 construction. <br /> The scope of services is modified as follows: <br /> 1. Annual Escalation of Wage Rates ($6,300)—The amount of compensation for the work <br /> authorized by Amendment 2 was based on 2009 wage rates. Now that the project will be re- <br /> bid in January, 2010, with construction anticipated for 2010,the amount of compensation is <br /> adjusted to accommodate the 2010 wage schedule. <br /> 2. Hydraulic Cylinder Installation($40,400)—The additional services required to facilitate <br /> replacement of the hydraulic cylinders with the 2010 project are as follows: <br /> a. Review of Contractor's submittals. <br /> b. Telephone and written correspondence to support response to Contractor's Request <br /> for Information(RFI) during the fabrication of the cylinders. <br /> c. Pre-production meetings and manufacturer's shop visits to observe hydraulic <br /> cylinder testing required by the specifications. <br /> d. Field observations during installation and functional testing of the hydraulic <br /> cylinders. <br /> Page � 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.