R2009-195 AUTHORIZING THIRD AMENDMENT TO AGREEMENT WITH HANSON PROFESSIONAL SERVICES, INC.
COD
>
City Clerk
>
RESOLUTIONS
>
2009
>
R2009-195 AUTHORIZING THIRD AMENDMENT TO AGREEMENT WITH HANSON PROFESSIONAL SERVICES, INC.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/13/2015 8:13:25 AM
Creation date
10/13/2015 8:13:25 AM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R2009-195
Res Ord Title
AUTHORIZING THIRD AMENDMENT TO AGREEMENT WITH HANSON PROFESSIONAL SERVICES, INC. FOR LAKE DECATUR DAM REPAIRS
Department
Public Works
Approved Date
10/5/2009
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3. Revise Plans, Specifications and Estimates ($10,500)—Hanson will revise bidding <br /> documents, plans and estimates to reflect the change in the bid dates, and the installation of <br /> the cylinders. Hanson will review the status of the existing environmental permits. Hanson <br /> will also update and expand the list of plan room locations to provide a wider range of <br /> contractors to bid the project. <br /> Sumttrary of Professional Design Setvices <br /> Lake Decahu�Dam Repaus <br /> Hanson Professional Services Inc. <br /> Desigi Constnhction <br /> Date Descr�tion Services Services Subtotal Project Total Cormnents <br /> 1/20/2009 Original Agreement $78,100 $5,300 $83,400 $83,400 Dam repans phns <br /> 4/6/2009 Amendmetrt No. 1 $26,700 $0 $26,700 $110,100 Add scope for gate seals and machaiery <br /> Add scope for 2009 Phase I <br /> 6/4/2009 Amendme�rt No.2 $24,700 $104,582 $129,282 $239,382 construction and apron�vesti�tion <br /> Add scope for cylmder�stallation and <br /> 10/5/2009 Amendme�rt No.3 $14,800 $42,400 $57,200 $296,582 escahtion�r changing Phase I to 2010 <br /> Total $144,300 $152,282 $296,582 <br /> Future Work <br /> The Lake Decatur Dam rehabilitation work was initially planned to be a three year, three phase <br /> project, however, since no bids were received for the 2009 work, it is necessary to reschedule the <br /> project. Due to the anticipated early start in 2010 staff expects all work can still be completed by <br /> 2011. The overall two year project is expected to approach a total cost of$4 million. The work <br /> will include the following: <br /> 2010 Construction <br /> The dam rehabilitation project is to begin in 2010. This work will include: <br /> 1. Repairs to the upstream face of the dam, <br /> 2. Rehabilitation of the mechanical systems that raise and lower the sluice gates on the north <br /> side of the dam. <br /> 3. Replacing the seal systems for the bascule gates and sluice gates. <br /> 4. Removal of gate heaters along the bascule gates. <br /> 5. Installation of a concrete patch on the downstream spillway of the dam. <br /> 6. Replace all eight cylinders on the bascule gates of the dam. <br /> The estimated total project cost is $2.5 million. <br /> 2011 Construction <br /> The dam rehabilitation project to be constructed summer of 2011 is expected to include: <br /> 1. Evaluation of the 2010 test patch and patching the full downstream spillway. <br /> 2. Grout crack injection of the dam to reduce water infiltration through the dam. <br /> 3. Repair of downstream scour damage below the dam. <br /> Page � 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.