My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2009-162 AUTHORIZING AN AGREEMENT WITH SHIVE-HATTERY, INC.
COD
>
City Clerk
>
RESOLUTIONS
>
2009
>
R2009-162 AUTHORIZING AN AGREEMENT WITH SHIVE-HATTERY, INC.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/13/2015 9:32:45 AM
Creation date
10/13/2015 9:32:40 AM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R2009-162
Res Ord Title
AUTHORIZING AN AGREEMENT WITH SHIVE-HATTERY, INC. FOR ENGINEERING SERVICES FOR PRELIMINARY DRAINAGE DESIGN ON SUNSET AVENUE
Department
Public Works
Approved Date
9/8/2009
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
, � <br /> � �3ov����-x�r�� <br /> (8�X))79S-f3fX)? <br /> SH I V E HATT F RY F.4X:(?09)��-SROR <br /> P ubro:i:www.shivc-haucrvsum <br /> tihicc-11an�7v.Inc. <br /> _'103 k:astland Lhi�c <br /> lihwmineton.11, fil'OJ <br /> PROPOSAL FOR SERVICES <br /> T'O: City of Dccatur <br /> ATTN: Mrs. Mary Cavc <br /> #I Gary K. Andcrson Pla�a <br /> Dccatur, IL 62523-1 l96 <br /> PROJECT NAME: Sunset Avenue Preliminary Drainage Design Ser�•ices <br /> DAT`E: August 27, 2009 <br /> PROJECT DESCRIPTION: Your project is a drainage study of the Simset A��enue area as <br /> outlined on the�ttacl�ed exhibit `A'. <br /> Tl�c undcrsigncd Clicnt and Shivc-Hattcry, Inc. (S-H)agrcc as follows: <br /> SCOPE OF SERVICES: S-H will providc thc following scrviccs: <br /> • Projcct Kickoff Meeting to gct the full understanding of thc project needs, goals,and <br /> past obstacles to be overcomc. <br /> o Citv Staff <br /> o Intcrestcd Politicians <br /> o Obtain rccord datn Crom City <br /> (I mccting) <br /> • Neighborhood meeting to address: <br /> o Concerns <br /> o Solutions <br /> o Conscnsus Building <br /> o Rcvicw of projcct arca and scopc <br /> (I mccting G hours max) <br /> • Enginccring rcvicw of lhc drainagc arca,and drainagc nctwork upstrcam of thc project <br /> arca. <br /> o Engineering revie�r w•ill utilize existing data,��•here possible, including: <br /> ■ USGS— Digital Elevation Models, and Watershed Delineation <br /> Boi�ndaries <br /> • City of Decatur—As-built and record information <br /> (Alrcady in our Posscssion) <br /> • City of Dccatur staff <br /> (Past History, Storics ofproblcros, ctc) <br /> ■ City of Dccatur GIS Data <br /> o Ficld revicw of cxisting conditions including drainagc structures,draina�c <br /> swalcs, pump stations and controls, 11ood gatcs, ctc. <br /> ■ Re�iew Pump Capacity/Ratings <br /> o Re��iew of adec�uacy and functional life of existing facilities. <br /> o Rcvicw of currcnt rcgulations�vith respcct thc (lood protcction lcvics. <br /> (,(l�)I S I-U <br />
The URL can be used to link to this page
Your browser does not support the video tag.