Laserfiche WebLink
Whitmore Township Cost Estimate <br /> Oil Chipping <br /> � <br /> , I <br /> Christmas Tree Road <br /> Length: 1290 Ft <br /> Width: 18 Ft. <br /> Area: 2580 S.Y. <br /> Oil: 2580 S.Y. x 0.3 Gal Per. S.Y.X$223 Per. Gal. _ $1,726.02 <br /> CA16 Chips Placed By Contractor: (2580 S.Y. X 32 Ibs .Per. S.Y./2000 Ibs)X$ 6.50 Per. Ton= $ . 268.32 <br /> CA16 Chips Furnished By Township: (2580 S.Y.X 32 Ibs.,Per. S.Y/2000 Ibs)X$�16.51 Per. Ton = $ 681.12 <br /> Sub-Total= $2,675.46 <br /> Boyd Road <br /> Length: 2310 Ft <br /> Width: 21.5 Ft. <br /> Area: 5518.3 S.Y. <br /> Oil: 5518.3 S.Y. x 0.3 Gal. Per. S.Y. X$2.23 Per. Gal. _ $3,691.77 <br /> CA16 Chips Placed By Contractor: (5518.3 S.Y.X 32 Ibs.Per. S.Y./2000 Ibs)X$ 6.50 Per. Ton = $ 573.90 <br /> CA16 Chips Furnished By Township: (5518.3 S.Y. X 321bs. Per. S.Y/2000 Ibs)X$ 16.51 Per/Ton = $1,457.71 <br /> Sub-Total= $5,723.38 <br /> Garver Church Road <br /> Length: 1560 Ft <br /> Width: 22 Ft. <br /> Area: 3813.3 S.Y. <br /> Oil: 3813.3 S.Y. x 0.3 Gal. Per. S.Y. X$2.23 Per. Gal. _ $ 2,551.10 <br /> CA16 Chips Placed By Contractor: (3813.3 S.Y.X 32 Ibs .Per. S.Y./2000 Ibs)X$6.50 Per. Ton = $ 396.50 <br /> CA16 Chips Furnished By Township: (3813.3 S.Y. X 321bs. Per. S.Y/2000 Ibs)X$ 16.51 Per/Ton = $ 1,007.11 <br /> Sub-Total= $ 3,954J1 <br /> Total Estimated Cost= $12,353.55 <br /> I <br /> I <br /> � <br />