Laserfiche WebLink
. <br /> � ���� Local Agency State Contract Day Labor Local Contract RR Force Account <br /> ��� City of Decatur � � � � <br /> Local Agency Amendment#1 for Section: 08-00503-00-BR Fund T <br /> Federal Partici ation v�� /�U ITEP Number: <br /> Construction Engineering Right-0f-W ay <br /> Job Number Project Number Job Number Project Number Job Number Project Number <br />, C-97-092-09 ARA-5169(042) <br /> This Amendment is made and entered into between the above local agency hereinafter referred to as the"LA"and the state af Illinois,acting by and through <br /> ks Department of Transportation,hereinafter referred to as"STATE". The STATE and LAjointly propose to improve the designated location as described <br /> below. The improvement shall be constr�cted in accordance with plans approved by the STATE and the STATE's policies and procedures approved and/or <br /> required by the Federal Highway Administration hereinafter referred to as"FHWA". <br /> BE IT MUTUALLY AGREED that all remaining provisions of the original agreement not akered by this Amendment shali remain in full force and effect and the <br /> Amendment shall be binding upon and inure to the benefit of the parties hereto,their successors and assigns. <br /> Amended Division of Cost <br /> Type of Work FHWA % STATE % LA % Total <br /> Participating Construction 792,000 ( * ) ( ) 374,473 ( BAL ) 1,166,473 <br /> Non-Participating Construction ( ) ( ) � � <br /> Preliminary Engineering ( ) ( � � � <br /> Construction Engineering ( ) � � � � <br /> Right of Way ( ) ( � � � <br /> Railroads ( ) � � � � <br /> Utilities ( ) ( � � � <br /> Materials <br /> TOTAL $ 792,000 $ $ 374,473 <br /> $ 1,166,473 <br /> 100%ARU Funds NTE$792,000 <br /> NOTE: The costs shown in the Division of Cost table are approximate and subject to change. The final LA share is dependent on the final Federai and <br /> State participation. The actual costs will be used in the final division of cost for billing and reimbursment. <br /> If funding is not a percentage of the total,place an asterisk in the space provided for the percentage and explain above. <br /> The Federal share of construction engineering may not exceed 15%of the Federal share of the final construction cost. <br /> APPROVED APPROVED <br /> Local Agency State of Illinois <br /> Departm nt of Transportation <br /> Michael T. McElroy r6--�-0� <br /> (Print or Type Name) Gary ,Secretary o ran ation Date <br /> Mayor By: i� <br /> (County Board Chairperson/MayorNillage Presid t/ tc.) (Delegate's Signature) i <br /> � � ' <br /> ; � f G , ,/' ��� C�J '� <br /> -'� �( `��' � (Delegate'sName Printed) <br /> i na ate <br /> ly 1 <br /> Chr e M.Reed,Di or of Hig ays/Chief ngineer Date <br /> TIN Number <br /> �� <br /> NOTE: If signature is by an APPOINTED official,a resolution authorizing en,1. chanzle- sk� , i unsel Date <br /> said appointed official to execute this agreemerrt is required. <br /> �D � 09 <br /> Ann L.Schneider,Director of Finance and Administration Date <br /> Printed 6/29/2009 BLR 05311 (Rev.05/28/09) <br />